1 Kenilworth Pl, Brooklyn
- Built
- 2007
- Floors
- 8
- Building type
- Hotel
- Zoning district
- R5B
- Lot area
- 10,165 sq ft
- Floor area
- 58,027 sq ft
En español: 9 violaciones abiertas, ninguna de Clase C.
Open now
- 9See the 9
OATH/ECB summonses still active
- OATH/ECB summonses
- 65 DOB and FDNY summonses here since January 1, 2019, with $93,268 in penalties imposed. 9 of them are still active, the same 9 listed under OATH/ECB. 38 judgments docketed, the latest on September 8, 2026. A docketed judgment shows up in a title search.
- May 19, 2026, DOB: Electric equipment room not dedicated to electric distribution equipment only. Admitted, $1,200 penalty imposed.
- May 19, 2026, DOB: Electrical work without a permit. Admitted, $2,500 penalty imposed.
- May 19, 2026, DOB: Failure to maintain building in code-compliant manner: Boiler. Admitted, $1,250 penalty imposed.
The newest 3 of 65 summonses OATH lists here. The report lists all 65, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 1 active DOB violation, issued March 27, 2026.
- DOB complaints
- 11 DOB complaints in the 12 months to September 25, 2026. The newest was filed June 25, 2026.
- DOB facade
- Rated SWARMP in the latest facade report, filed November 1, 2022 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- DOB NOW lists 2 work permits here, the newest issued March 30, 2026, for Boiler Equipment work.
- Boiler Equipment, issued March 30, 2026, signed off.
- Boiler Equipment, issued January 5, 2026, signed off.
- Energy benchmarking
- ENERGY STAR score 54 for 2024, against a median of 77 for Residence Hall/Dormitory that year.
- Local Law 97
- Covered since 2024 (DOB's list, March 1, 2026).
- Bedbug report
- Filed June 25, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| OATH/ECB | 9 open | |||
| Class 1 | Admitted | 39189137X | New Brooklyn Development LLC | |
| Class 1 | Admitted | 39189136Y | New Brooklyn Development LLC | |
| Boilers, Class 2 | Admitted | 39189088Z | New Brooklyn Development LLC | |
| Boilers, Class 2 | Admitted | 39189087R | New Brooklyn Development LLC | |
| Elevators, Class 1 | Decided by default | 39185697X | New Brooklyn Development LLC | |
| Construction, Class 2 | Found in violation | 39148745Z | ||
| Construction, Class 2 | Found in violation | 39148740J | ||
| Construction, Class 2 | Found in violation | 37033097R | ||
| Boilers, Class 2 | Settled by agreement | 39097465R | ||
The full report on 1 Kenilworth Pl, Brooklyn
- All 9 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 65 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 9 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 1 Kenilworth Pl, Brooklyn, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.