Skip to content
ViolationScout12 open Class C, with nothing filed or new in the last 180 days.Is this your building?
Buildings1 Morningside Avenue, ManhattanCurrent through

1 Morningside Ave, Manhattan

BBL 1-01849-0002

En español: 12 violaciones de Clase C abiertas (peligro inmediato) y 39 abiertas en total.

Open violations are sitting, with little movement either way. 12 open Class C, with nothing filed or new in the last 180 days.

Since September 28, 2023, a certification was filed on 1 Class C violation, by the original certify-by date. How certification works

Is this your building?

12 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

OATH hearings
6 hearings scheduled on DOB summonses, the first on October 8, 2026.
DOB violations
2 active DOB violations. The newest was issued March 11, 2025.
Housing court
1 open housing court case, opened August 9, 2023.
DOB complaints
3 DOB complaints in the last 12 months. The newest was filed August 2, 2026.
DOB facade
Rated Safe in the latest facade report, filed December 14, 2021 (inspection cycle 9).
DOB permits
1 DOB work permit in effect, for General Construction work, issued December 3, 2025.
Certificate of occupancy
Final, issued April 26, 2022.
Energy benchmarking
ENERGY STAR score 87 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C12 open most often Fire Safety
Notice sent18736939351 W. 114TH STREET HDFC
Fire SafetyNotice sent18736935351 W. 114TH STREET HDFC
Notice sent17753928
Fire SafetyNotice sent16968262
Fire SafetyNotice sent16968261
Fire SafetyNotice sent16968257
Fire SafetyNotice sent16968255
Fire SafetyNotice sent16968254
Fire SafetyNotice sent16968253
Fire SafetyNotice sent16968249
Fire SafetyNotice sent16968239
Fire SafetyNotice sent16952348
Class B12 open most often Fire Safety
Notice sent18736940351 W. 114TH STREET HDFC
Notice sent18736938351 W. 114TH STREET HDFC
Fire SafetyNotice sent18736937351 W. 114TH STREET HDFC
Fire SafetyNotice sent18736936351 W. 114TH STREET HDFC
Notice sent18736934351 W. 114TH STREET HDFC
Notice sent18736933351 W. 114TH STREET HDFC
Notice sent18736932351 W. 114TH STREET HDFC
Notice sent17753931
Notice sent17753930
Notice sent17753929
Fire SafetyNotice sent16968234
Fire SafetyNotice sent16968232
OATH/ECB15 open most often Construction
Construction, Class 2Hearing pending39198238J351 W. 114TH STREET HDFC
Construction, Class 2Hearing pending39198237H351 W. 114TH STREET HDFC
Construction, Class 2Hearing pending39198236X351 W. 114TH STREET HDFC
Construction, Class 2Hearing pending39198235Y351 W. 114TH STREET HDFC
Construction, Class 2Hearing pending39198234M351 W. 114TH STREET HDFC
Construction, Class 2Hearing pending39198233K351 W. 114TH STREET HDFC
Class 2Found in violation39153489P
Construction, Class 1Found in violation39153488N
Construction, Class 1Admitted39142077P
Construction, Class 1Found in violation39142072X
Class 1Admitted39142062M
Construction, Class 1Admitted39142027R
Construction, Class 2Found in violation39134685Z
Construction, Class 3Found in violation39128413Y
Construction, Class 3Found in violation39128412M

Nearby buildings

Questions about this building

Does 1 Morningside Avenue, Manhattan have open violations?

Yes. 1 Morningside Avenue, Manhattan had 39 open violations on September 26, 2026: 15 from OATH/ECB and 24 from HPD. 12 are Class C, the class HPD treats as immediately hazardous.

Is 1 Morningside Avenue, Manhattan getting better or worse?

Open violations are sitting, with little movement either way. 12 open Class C, with nothing filed or new in the last 180 days. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 1 Morningside Avenue, Manhattan?

Since September 28, 2023, a certification was filed on 1 Class C violation, by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 1 Morningside Avenue, Manhattan have an OATH hearing coming up?

Yes. 6 hearings scheduled on DOB summonses, the first on October 8, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 1 Morningside Avenue, Manhattan have active DOB violations?

Yes. 2 active DOB violations. The newest was issued March 11, 2025. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 1 Morningside Avenue, Manhattan in housing court?

Yes. 1 open housing court case, opened August 9, 2023. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 1 Morningside Avenue, Manhattan?

Yes. 3 DOB complaints in the last 12 months. The newest was filed August 2, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade report find at 1 Morningside Avenue, Manhattan?

Rated Safe in the latest facade report, filed December 14, 2021 (inspection cycle 9). Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 1 Morningside Avenue, Manhattan?

Yes. 1 DOB work permit in effect, for General Construction work, issued December 3, 2025. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

Does 1 Morningside Avenue, Manhattan have a certificate of occupancy?

Its latest certificate of occupancy is a final one, issued April 26, 2022. A certificate of occupancy says how a building may be used and occupied. A temporary one lets people move in while work finishes and has to be renewed until DOB issues the final one. DOB's records here start in July 2012, so an older certificate may not show.

What is the ENERGY STAR score for 1 Morningside Avenue, Manhattan?

ENERGY STAR score 87 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

Is 1 Morningside Avenue, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

When was 1 Morningside Avenue, Manhattan built?

The city's record gives 1901 as the year 1 Morningside Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator apartment building with 7 floors.

How many apartments does 1 Morningside Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 36 residential units at 1 Morningside Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, DOB violations, HPD's housing court cases, DOB complaints, DOB facade filings, DOB NOW work permits, DOB certificates of occupancy, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, DOB violations, HPD's housing court cases, DOB complaints, DOB facade filings, DOB NOW work permits, DOB certificates of occupancy, Local Law 84 energy reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 1 Morningside Ave, Manhattan: violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/1-morningside-avenue-manhattan

How we count: /method.

Is this your building?