HPD violation classes: what A, B and C mean.
Class C violations in HPD's data, the immediately hazardous class, with 24 hours to correct most conditions
See what is open on one building.
HPD violation classes sort every housing maintenance violation into A, B or C by hazard, and the class sets the correction window: 90 days for Class A, 30 days for Class B and 24 hours for most Class C. In HPD's correction table, lead paint, window guards, mold, mice, cockroaches and rats get 21 days, self-closing doors get 14, and heat and hot water get no time. The class is printed on the Notice of Violation and in HPD's public data. What the data adds is what happens after the window: of the 2,874,007 Class A, B and C violations we hold, 43.1% have ever been certified corrected. The share does not follow the urgency. Class B certifies at 47.4% and Class C, the class with the shortest windows, at 45.6%. Class A, with 90 days, is the lowest at 32.4%.
If you own or manage the building. The class tells you the clock. A Class C notice gives 24 hours to correct most conditions and a later certify-by date for the certification, a median of 21 days after the inspection; the median owner who certifies at all files at 16 days, and 92.6% file by that date. Every class stays open on the building until a certification is accepted, and every class comes up at sale, refinance and permit.
If you clear violations for a living. Class C is where the penalty process concentrates, and 290,960 Class C violations are open right now, 31.5% of all the Class C we hold. That is the open work, by class.
If you rent here. The class is HPD's own reading of how dangerous the condition is. A Class C means an inspector found an immediately hazardous condition; whether it was fixed is a separate fact, and HPD's data only shows it as a certification.
The three classes, and the window each sets
The housing maintenance code names the class; HPD's inspector assigns it on the day of inspection. The window runs from the date the Notice of Violation is served, in HPD's correction table, and a certification filed after it lands as NOV Certified Late, which HPD does not accept. The route then is a Dismissal Request.
| Class | What it means | Violations | Ever certified | Median days to certify |
|---|---|---|---|---|
| A | not hazardous, correct within 90 days | 706,268 | 32.4% | 51 |
| B | hazardous, correct within 30 days | 1,244,585 | 47.4% | 38 |
| C | immediately hazardous, correct within 24 hours for most conditions | 923,154 | 45.6% | 16 |
| I | registration and Alternative Enforcement Program orders, cleared by filing, not by certification | 211,973 | cleared by filing, no certification path | |
Median days runs from inspection to the filed certification, over the violations in that class that carry one. Class I carries no certification path, so no figure is shown.
Class C right now
Of the 923,154 Class C violations HPD has recorded, 290,960 are open right now, 31.5%. 420,741 have ever been certified corrected. Between those two numbers sit the violations nobody filed on: some corrected with no certification, some never corrected, and HPD's data cannot tell them apart. The citywide page reads the same class over the trailing three years.
Which class each category lands in
The class follows the condition, not the category. Across the six categories this site tracks, Heat and hot water, Lead paint and Vermin and pests are mostly Class C; Water leaks and Electrical are mostly Class B; Mold is mostly Class A. The split is citywide, read from the same scan behind the thirty borough and category pages.
| Category | Class A | Class B | Class C | Most common |
|---|---|---|---|---|
| Heat and hot water | 2,815 | 6,786 | 157,300 | Class C, 94% |
| Lead paint | 0 | 8,710 | 71,086 | Class C, 89% |
| Vermin and pests | 12 | 13,884 | 211,473 | Class C, 94% |
| Mold | 63,357 | 61,414 | 12,468 | Class A, 46% |
| Water leaks | 28,830 | 168,027 | 29,004 | Class B, 74% |
| Electrical | 6,940 | 40,966 | 12,861 | Class B, 67% |
Counts are of violations whose description matches the category, citywide. A violation is in exactly one class.
What the class changes, and what it does not
The class changes the window and the order in which HPD reinspects. It does not change the path to clearing a violation. Every class clears the same way: correct the condition, file the certificate of correction with HPD, and wait for the status to move to NOV Certified On Time. HPD does not accept a late one, which shows as NOV Certified Late; past the date the route is a Dismissal Request. What the certificate is, and where filings land, is on the certificate of correction guide.
The class also does not age. A Class A violation from years ago stays Class A and stays visible, and a title search or a lender's review reads it the same way as a new one. The only ways out are certification, dismissal, or closure, each its own status in the glossary.
Common questions about HPD violation classes
What is a Class C HPD violation?
The immediately hazardous class: no heat, no hot water, lead paint where a child under 6 lives, a gas leak, an unsafe stair. The correction window in HPD's correction table is 24 hours for most conditions; lead paint, window guards, mold, mice, cockroaches and rats get 21 days, self-closing doors get 14, and heat and hot water get no time. Of the 923,154 Class C violations we hold, 45.6% have ever been certified corrected, at a median of 16 days from inspection.
How long do I have to correct a Class B violation?
30 days from the date HPD mails the Notice of Violation. Class B is the hazardous class: mold, vermin, a leak, a defective window guard. We hold 1,244,585, and 47.4% have ever been certified, at a median of 38 days.
Is a Class A violation serious?
It is the non-hazardous class, with a 90-day window: a peeling ceiling, a missing sign, a minor plumbing defect. It still stays open on the building until certified, and it still comes up at sale or refinance. We hold 706,268, and at 32.4% ever certified it is the class least likely to be certified, below both hazardous classes.
What is a Class I violation?
HPD's registration and Alternative Enforcement Program orders, not a hazard class. They clear by filing the registration or completing the program, never by a certificate of correction, which is why no certification figure is shown for them. We hold 211,973.
What the class data does not tell you
It does not say whether a condition is fixed. It says whether a certification was filed, which is not an inspection. It does not show the penalty on a violation: HPD's civil penalty process and the courts set those, and they appear here only as statuses. It names no building and no owner. To see one building's violations, use the form above, the HPD violations lookup or the city's own HPD Online.
Cite this page
ViolationScout, HPD violation classes: what A, B and C mean, counts by class, share ever certified, and median days to certification over HPD's Housing Maintenance Code Violations dataset. Figures through November 14, 2026, read on November 16, 2026. https://violationscout.com/guides/hpd-violation-classes
Counts by class over every violation in our copy of HPD's data; certified means the violation has a certified date; median days is the median of certified date minus inspection date over violations that have both. Source: NYC Open Data. How every figure here is counted: /methodology.
No building and no owner is named on this page. Every figure comes from our copy of HPD's Housing Maintenance Code Violations data on NYC Open Data. The guides, the status glossary, how to check your own building.