Skip to content
Buildings412 West End Avenue, ManhattanCurrent through

412 West End Ave, Manhattan

BBL 1-01227-0061 Riverside-West End Historic District Extension I

Built
1900
Floors
8
Residential units
40
Building type
Elevator building
Zoning district
R10A
Lot area
7,500 sq ft
Floor area
49,840 sq ft

En español: 5 violaciones abiertas. La más antigua del HPD lleva 4 años abierta, desde el 17 de diciembre de 2021.

Open now, most hazardous first

  1. 4

    Class B, hazardous

    See the 4
  2. 1

    OATH/ECB summons still active

    See it

Since October 12, 2023, certifications were filed on 3 Class C violations, all 3 by the original certify-by date. How certification works

The original certify-by dates on the 4 open HPD violations have all passed. The latest was December 2, 2025. The report prints the date beside each one.

Is this your building?

5 open violations. The oldest open HPD violation was filed December 17, 2021.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH/ECB summonses
14 DOB and FDNY summonses here since January 1, 2019, with $8,255 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 4 judgments docketed, the latest on December 31, 2024. A docketed judgment shows up in a title search.
  • August 19, 2025, FDNY: Rooftop access and means of egress. In violation.
  • March 19, 2025, FDNY: Fire protection systems. In violation.
  • March 18, 2025, FDNY: Inspection and testing. In violation.

The newest 3 of 14 summonses OATH lists here. The report lists all 14, with each outcome, the penalty imposed and any docketing date. What the report adds

DOB violations
1 active DOB violation, issued February 22, 2023.
DOB complaints
1 DOB complaint in the 12 months to September 25, 2026. It was filed June 3, 2026.
DOB facade
Rated Safe in the latest facade report, filed May 1, 2025 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe in 2007, and SWARMP in 2012 and 2018. SWARMP means safe with a repair and maintenance program.
DOB permits
1 DOB work permit in effect, for Plumbing work, issued April 22, 2026.
  • Boiler Equipment, issued August 21, 2026, signed off.
  • Plumbing, issued April 22, 2026, in effect until November 4, 2026.
  • Plumbing, issued April 25, 2025, signed off.

The newest 3 of 8 permits DOB NOW lists here. The report lists all 8, with job numbers and each job's estimated cost. What the report adds

Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
Inspected April 13, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 15, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class B4 open
Notice sent18296823
Notice sent18296822
Notice sent16930721
Notice sent16930720
OATH/ECB1 open
Construction, Class 2Found in violation35681939R

The full report on 412 West End Ave, Manhattan

Get the report on 412 West End Ave, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 412 West End Avenue, Manhattan have open violations?

Yes. 412 West End Avenue, Manhattan had 5 open violations on October 10, 2026: 4 from HPD and 1 from OATH/ECB. None of them is Class C, but counting every year, HPD has 3 Class C violations still open here. The oldest open HPD violation has been open 4 years, since December 17, 2021.

When were certifications filed on Class C violations at 412 West End Avenue, Manhattan?

Since October 12, 2023, certifications were filed on 3 Class C violations, all 3 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 412 West End Avenue, Manhattan have active DOB violations?

Yes. 1 active DOB violation, issued February 22, 2023. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has DOB received complaints about 412 West End Avenue, Manhattan?

Yes. 1 DOB complaint in the 12 months to September 25, 2026. It was filed June 3, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade report find at 412 West End Avenue, Manhattan?

Rated Safe in the latest facade report, filed May 1, 2025 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe in 2007, and SWARMP in 2012 and 2018. SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 412 West End Avenue, Manhattan?

Yes. 1 DOB work permit in effect, for Plumbing work, issued April 22, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

When was the boiler at 412 West End Avenue, Manhattan last inspected?

On April 13, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 412 West End Avenue, Manhattan last file its bedbug report?

On December 15, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 412 West End Avenue, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 412 West End Avenue, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 412 West End Avenue, Manhattan built?

The city's record gives 1900 as the year 412 West End Avenue, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 8 floors.

How many apartments does 412 West End Avenue, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 40 residential units at 412 West End Avenue, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOB violations, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 412 West End Ave, Manhattan: 40 units, 5 open violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/412-west-end-avenue-manhattan

How we count: /method.

Is this your building?