97 Clinton St, Manhattan
- Built
- 1910
- Floors
- 5
- Residential units
- 9
- Building type
- Walk-up building
- Zoning district
- R7A
- Lot area
- 2,530 sq ft
- Floor area
- 9,850 sq ft
En español: 1 violación de Clase C abierta (peligro inmediato) y 9 abiertas en total. La más antigua del HPD lleva 11 años abierta, desde el 13 de junio de 2015.
Open now, most hazardous first
- 1Get it certified
Class C, immediately hazardous
- 6See the 6
Class B, hazardous
- 2See the 2
OATH/ECB summonses still active
Open violations are sitting, with little movement either way. 1 open Class C, with 5 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.
Since October 12, 2023, certifications were filed on 5 Class C violations: 2 by the original certify-by date, 3 after it. How certification works
The original certify-by dates on the 7 open HPD violations have all passed. The latest was August 24, 2026. The report prints the date beside each one.
- OATH/ECB summonses
- 3 DOB summonses here since January 1, 2019, with $7,125 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 2 judgments docketed, the latest on June 30, 2025. A docketed judgment shows up in a title search.
- December 16, 2024, DOB: Failure to file complete boiler inspection report. Decided by default, $3,125 penalty imposed.
- August 1, 2024, DOB: Work without a permit. Dismissed.
- December 11, 2023, DOB: Unapproved unsafe unsuitable electrical equipment or wiring in use. Decided by default, $4,000 penalty imposed.
- DOB violations
- 6 active DOB violations, most of them for low-pressure boilers. The newest was issued November 14, 2025.
- Housing court
- 10 housing court cases here since 2014.
- Bedbug report
- Filed May 29, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 3 completed HPD emergency repair orders since October 12, 2023, awarded for $4,216 in total. The most recent of the 3, a general construction order, was opened November 1, 2024.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 1 open | |||
| Vermin / Infestation | Notice sent to tenant | 18713899 | ||
| Class B | 6 open | |||
| CIV14 mailed | 19050319 | Yick Fat Realty | ||
| CIV14 mailed | 19050317 | Yick Fat Realty | ||
| CIV14 mailed | 19050315 | Yick Fat Realty | ||
| No access to reinspect (first try) | 17716205 | |||
| No access to reinspect (first try) | 17550145 | |||
| No access to reinspect (first try) | 17312864 | |||
| OATH/ECB | 2 open | |||
| Boilers, Class 2 | Decided by default | 37032012Y | ||
| Class 2 | Decided by default | 39101136P | ||
The full report on 97 Clinton St, Manhattan
- All 9 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 11,097 Manhattan buildings with 6 to 19 apartments.
- All 3 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 2 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 97 Clinton St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.