1563 Walton Ave, Bronx
- Built
- 1928
- Floors
- 6
- Residential units
- 26
- Building type
- Walk-up building
- Zoning district
- R8
- Lot area
- 7,071 sq ft
- Floor area
- 27,083 sq ft
En español: 2 violaciones de Clase C abiertas (peligro inmediato) y 5 abiertas en total. La más antigua del HPD lleva 6 años abierta, desde el 30 de octubre de 2019.
Open now, most hazardous first
- 2Get these certified
Class C, immediately hazardous
- 1See it
Class B, hazardous
- 2See the 2
OATH/ECB summonses still active. Most often Construction.
Open violations are sitting, with little movement either way. 2 open Class C, with 1 certification filed and 2 new Class C in the last 180 days, too few to call a direction.
Since October 12, 2023, certifications were filed on 3 Class C violations, all 3 by the original certify-by date. How certification works
The original certify-by dates on the 3 open HPD violations have all passed. The latest was October 3, 2026. The report prints the date beside each one.
- OATH hearings
- A hearing on a DOB summons is set for October 30, 2026.
- OATH/ECB summonses
- 5 DOB summonses here since January 1, 2019, with $3,750 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB.
- August 15, 2026, DOB: Failure to maintain building in code-compliant manner. $2,500 penalty imposed.
- August 22, 2024, DOB: Unlawful acts. Failure to comply with an order of the commissioner. Dismissed.
- July 8, 2024, DOB: Failure to maintain building walls or appurtenances. Dismissed.
The newest 3 of 5 summonses OATH lists here. The report lists all 5, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 2 active DOB violations, most of them for construction. The newest was issued April 16, 2024.
- DOB permits
- 1 DOB work permit in effect, for Sidewalk Shed work, issued September 10, 2026.
- Energy benchmarking
- ENERGY STAR score 11 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected March 5, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 5, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- Tax exemption
- Has an Article XI tax exemption (DOF 2026/27 roll).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 2 open | |||
| Fire Safety | Not complied with | 19211612 | NEWSET II HDFC | |
| Notice sent | 19174270 | NEWSET II HDFC | ||
| Class B | 1 open | |||
| Not complied with | 16724054 | |||
| OATH/ECB | 2 open most often Construction | |||
| Construction, Class 1 | Hearing pending | 35730913R | NEWSET II HDFC | |
| Construction, Class 2 | Found in violation | 35683607J | ||
The full report on 1563 Walton Ave, Bronx
- All 5 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 3,231 Bronx buildings with 20 to 49 apartments.
- All 1 DOB NOW work permit, with job numbers and each job's estimated cost.
- All 5 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 2 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 1563 Walton Ave, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.