30 Park Ave, Manhattan
- Built
- 1955
- Floors
- 20
- Residential units
- 237
- Building type
- Elevator building
- Zoning district
- R10
- Lot area
- 17,485 sq ft
- Floor area
- 236,315 sq ft
En español: 2 violaciones abiertas, ninguna de Clase C. La más antigua del HPD lleva 3 meses abierta, desde el 12 de junio de 2026.
Open now, most hazardous first
Since October 12, 2023, certifications were filed on 3 Class C violations, all 3 by the original certify-by date. How certification works
The original certify-by date on the open HPD violation, August 3, 2026, has passed. The report prints it beside the violation.
- OATH/ECB summonses
- 10 DOB and FDNY summonses here since January 1, 2019, with $7,705 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 2 judgments docketed, the latest on December 31, 2020. A docketed judgment shows up in a title search.
- August 4, 2026, FDNY: Labels markings. In violation.
- June 3, 2026, DOB: Failure to maintain elevator or conveying system. Decided by default, $655 penalty imposed.
- December 13, 2022, DOB: Miscellaneous sign violation under the zoning resolution. In violation.
The newest 3 of 10 summonses OATH lists here. The report lists all 10, with each outcome, the penalty imposed and any docketing date. What the report adds
- Housing court
- 2 housing court cases here since 2005, most of them tenant actions.
- DOB complaints
- 6 DOB complaints, 1 of them conversion complaint, in the 12 months to September 25, 2026. The newest was filed August 3, 2026.
- DOB facade
- Rated SWARMP in the latest facade report, filed January 18, 2022 (inspection cycle 9). Reports in earlier inspection cycles rated it SWARMP in 2007, Unsafe in 2012, and Safe in 2013 and 2016. SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- 1 DOB work permit in effect, for General Construction work, issued July 15, 2026.
- General Construction, issued July 15, 2026, in effect until March 31, 2027.
- Sidewalk Shed, issued July 2, 2026, expired September 30, 2026.
- General Construction, issued January 6, 2026, signed off.
The newest 3 of 14 permits DOB NOW lists here. The report lists all 14, with job numbers and each job's estimated cost. What the report adds
- Certificate of occupancy
- Final, issued August 17, 2021.
- Local Law 97
- Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026).
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on September 9. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 22, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class B | 1 open | |||
| Notice sent | 19001410 | 30 PARK AVENUE LLC | ||
| OATH/ECB | 1 open | |||
| Elevators, Class 2 | Decided by default | 39190969R | 30 PARK AVENUE LLC | |
The full report on 30 Park Ave, Manhattan
- All 2 open violations, each with the city's own words and the date on its notice.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 794 Manhattan buildings with 200 or more apartments.
- All 14 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 10 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 30 Park Ave, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.