2-01 50th Ave, Queens
- Built
- 2000
- Floors
- 32
- Residential units
- 372
- Building type
- Elevator building
- Zoning district
- M3-1
- Lot area
- 18,500 sq ft
- Floor area
- 395,509 sq ft
En español: 1 violación de Clase C abierta (peligro inmediato) y 3 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 2 de septiembre de 2024.
Open now, most hazardous first
- 1Get it certified
Class C, immediately hazardous
- 1See it
Class B, hazardous
- 1See it
OATH/ECB summons still active
Open violations are sitting, with little movement either way. 1 open Class C, with 3 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.
Since October 12, 2023, certifications were filed on 4 Class C violations, all 4 by the original certify-by date. How certification works
The original certify-by dates on the 2 open HPD violations have all passed. The latest was July 15, 2026. The report prints the date beside each one.
- OATH/ECB summonses
- 31 DOB and FDNY summonses here since January 1, 2019, with $17,270 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 7 judgments docketed, the latest on May 31, 2026. A docketed judgment shows up in a title search.
- August 5, 2026, FDNY: Inspection and testing.
- December 9, 2025, FDNY: Inspection and testing. In violation, $300 penalty imposed.
- June 4, 2025, FDNY: Sign, postings, notices and instructions. In violation, $2,150 penalty imposed.
The newest 3 of 31 summonses OATH lists here. The report lists all 31, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB complaints
- 1 DOB complaint in the 12 months to September 25, 2026. It was filed October 20, 2025.
- DOB facade
- 2 buildings on this lot are rated SWARMP in their latest facade reports, the newest filed November 7, 2022 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- 1 DOB work permit in effect, for Suspended Scaffold work, issued June 30, 2026.
- Suspended Scaffold, issued June 30, 2026, in effect until January 1, 2027.
- Suspended Scaffold, issued June 30, 2026, signed off.
- Mechanical Systems, issued June 15, 2026, signed off.
The newest 3 of 12 permits DOB NOW lists here. The report lists all 12, with job numbers and each job's estimated cost. What the report adds
- Certificate of occupancy
- Final, issued November 17, 2023.
- Local Law 97
- Covered since 2024 (DOB's list, March 1, 2026).
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on May 18. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 9, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 1 open | ||
| Notice sent | 18956646 | ||
| Class B | 1 open | ||
| Notice sent | 18956647 | ||
| OATH/ECB | 1 open | ||
| Elevators, Class 2 | Found in violation | 39149383P | |
The full report on 2-01 50th Ave, Queens
- All 3 open violations, each with the city's own words and the date on its notice.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 346 Queens buildings with 200 or more apartments.
- All 12 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 31 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 2-01 50th Ave, Queens, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.