47-07 41st St, Queens
- Built
- 1937
- Floors
- 6
- Residential units
- 59
- Building type
- Elevator building
- Zoning district
- R6A
- Lot area
- 14,000 sq ft
- Floor area
- 63,492 sq ft
En español: 1 violación de Clase C abierta (peligro inmediato) y 7 abiertas en total. La más antigua del HPD lleva 11 años abierta, desde el 11 de marzo de 2015.
Open now, most hazardous first
- 1Get it certified
Class C, immediately hazardous
- 5See the 5
Class B, hazardous
- 1See it
OATH/ECB summons still active
Certifications are being filed faster than new violations come in. 18 certifications filed against 1 new Class C in the last 180 days.
Since October 12, 2023, certifications were filed on 13 Class C violations: 12 by the original certify-by date, 1 after it. How certification works
The original certify-by dates on the 6 open HPD violations have all passed. The latest was September 30, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 1 on September 24, 2026 and 1 on October 8.
- OATH hearings
- A hearing on a DOB summons is set for November 10, 2026.
- OATH/ECB summonses
- 7 DOB and FDNY summonses here since January 1, 2019, with $4,717 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB.
- September 4, 2026, DOB: Failure to maintain building in code-compliant manner. $1,250 penalty imposed.
- March 31, 2026, FDNY: Inspection and testing. In violation.
- May 11, 2022, DOB: Failure to maintain elevator or conveying system. In violation, $312 penalty imposed.
The newest 3 of 7 summonses OATH lists here. The report lists all 7, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB complaints
- 2 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 11, 2026.
- DOB permits
- DOB NOW lists 2 work permits here, the newest issued May 19, 2025, for General Construction work.
- General Construction, issued May 19, 2025, signed off.
- Sidewalk Shed, issued May 2, 2025, signed off.
- Energy benchmarking
- ENERGY STAR score 89 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected January 31, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 15, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 1 open | |||
| Lead Paint | Lead documents accepted | 18990302 | Sylveen, LLC | |
| Class B | 5 open | |||
| Notice sent | 19135466 | Sylveen, LLC | ||
| Notice sent | 19135454 | Sylveen, LLC | ||
| Not complied with | 16681274 | |||
| Not complied with | 16681270 | |||
| Not complied with | 16655263 | |||
| OATH/ECB | 1 open | |||
| Construction, Class 2 | Hearing pending | 39203097Z | ||
The full report on 47-07 41st St, Queens
- All 7 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 1,253 Queens buildings with 50 to 99 apartments.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 7 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 47-07 41st St, Queens, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.