25-30 30th Rd, Queens
- Built
- 1931
- Floors
- 6
- Residential units
- 72
- Building type
- Elevator building
- Zoning district
- R6A
- Lot area
- 11,886 sq ft
- Floor area
- 48,258 sq ft
En español: 1 violación de Clase C abierta (peligro inmediato) y 2 abiertas en total. La más antigua del HPD lleva 16 años abierta, desde el 23 de julio de 2010.
Open now, most hazardous first
- 1Get it certified
Class C, immediately hazardous
- 1See it
OATH/ECB summons still active
Open violations are sitting, with little movement either way. 1 open Class C, with nothing filed or new in the last 180 days.
Since October 12, 2023, certifications were filed on 2 Class C violations, all 2 by the original certify-by date. How certification works
The original certify-by date on the open HPD violation, June 20, 2024, has passed. The report prints it beside the violation.
- OATH/ECB summonses
- 1 DOB summons here since January 1, 2019, with $1,250 in penalties imposed. It is still active, the one listed under OATH/ECB.
- April 11, 2024, DOB: Fail submit required report of critical examination documenting exterior wall. In violation, $1,250 penalty imposed.
- DOB violations
- 3 active DOB violations. The newest was issued February 22, 2023.
- DOB facade
- Rated SWARMP in the latest facade report, filed October 7, 2024 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe in 2018. SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- DOB NOW lists 3 work permits here, the newest issued August 23, 2024, for Suspended Scaffold work.
- Suspended Scaffold, issued August 23, 2024, expired August 23, 2025.
- Plumbing, issued April 28, 2023, signed off.
- Mechanical Systems, issued April 27, 2023, signed off.
- Energy benchmarking
- ENERGY STAR score 100 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected September 22, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed August 24, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 1 open | ||
| Heat / Hot Water | Notice sent | 17033169 | |
| OATH/ECB | 1 open | ||
| Local Law, Class 2 | Found in violation | 37028152Y | |
The full report on 25-30 30th Rd, Queens
- All 2 open violations, each with the city's own words and the date on its notice.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 1,253 Queens buildings with 50 to 99 apartments.
- All 3 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 1 DOB summons at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 25-30 30th Rd, Queens, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.