788 Riverside Dr, Manhattan
- Built
- 1911
- Floors
- 10
- Residential units
- 74
- Building type
- Elevator building
- Zoning district
- R8
- Lot area
- 11,125 sq ft
- Floor area
- 80,678 sq ft
- Last sale
- $10,200,000
En español: 1 violación abierta, ninguna de Clase C. La más antigua del HPD lleva 2 años abierta, desde el 29 de abril de 2024.
Open now
Since October 12, 2023, certifications were filed on 6 Class C violations, all 6 by the original certify-by date. How certification works
The original certify-by date on the open HPD violation, June 19, 2024, has passed. The report prints it beside the violation.
- OATH/ECB summonses
- 17 DOB and FDNY summonses here since January 1, 2019, with $35,005 in penalties imposed. 9 judgments docketed, the latest on January 31, 2026. A docketed judgment shows up in a title search.
- January 15, 2026, DOB: Work without a permit. Decided by default, $2,530 penalty imposed.
- December 18, 2025, DOB: Work without a permit. Adjourned, $2,500 penalty imposed.
- January 29, 2025, FDNY: Fire-rated construction. In violation, $450 penalty imposed.
The newest 3 of 17 summonses OATH lists here. The report lists all 17, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 5 active DOB violations, most of them for elevators. The newest was issued January 13, 1997.
- Housing court
- 1 housing court case here, opened in 2005.
- DOB complaints
- 5 DOB complaints in the 12 months to September 25, 2026. The newest was filed July 17, 2026.
- DOB facade
- Rated SWARMP in the latest facade report, filed April 3, 2023 (inspection cycle 9). An earlier report in this cycle, filed August 19, 2021, rated it Unsafe. Reports in earlier inspection cycles rated it SWARMP in 2013 and Unsafe then Safe in 2017. SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- 3 DOB work permits in effect. The latest, for General Construction work, was issued July 6, 2026.
- General Construction, issued July 6, 2026, in effect until October 30, 2026.
- General Construction, issued April 27, 2026, in effect until October 30, 2026.
- Plumbing, issued April 24, 2026, in effect until April 24, 2027.
The newest 3 of 12 permits DOB NOW lists here. The report lists all 12, with job numbers and each job's estimated cost. What the report adds
- Energy benchmarking
- ENERGY STAR score 94 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected May 6, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 12, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class B | 1 open | ||
| Mold | Defect letter sent | 16935462 | |
The full report on 788 Riverside Dr, Manhattan
- All 1 open violation, each with the city's own words and the date on its notice.
- What the one city status here means, and how many of these carry it.
- How it compares with the 2,038 Manhattan buildings with 50 to 99 apartments.
- All 12 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 17 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 788 Riverside Dr, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.