Skip to content
Buildings90 Nassau Street, ManhattanCurrent through

90 Nassau St

Manhattan, NY 10038

90 Nassau Street is an elevator building with 7 apartments, built in 1900. It has 4 open violations. The oldest open HPD violation was filed on November 18, 2026.

En español: 4 violaciones abiertas, ninguna de Clase C. La más antigua del HPD lleva 7 días abierta, desde el 18 de noviembre de 2026.

Open now

  1. 4

    OATH/ECB summonses still active. Most often Construction.

    See the 4
Zoning district
C5-5
Lot area
1,594 sq ft
Floor area
12,560 sq ft
Last sale
$10,250,000
Tax lot (BBL)
1-00078-0043

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
OATH/ECB4 open most often Construction
Local Law, Class 2Decided by default37036672HBERNART CAPITAL LLC
Construction, Class 1Found in violation39155012R
Construction, Class 1Found in violation39155011P
Construction, Class 2Hearing pending39134328K
Is this your building?Also for tenants and buyers
Is this your building?

An OATH hearing on February 22, 2027.

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: what each status means and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

HPD, by year
From 2017 to 2026, HPD filed 18 violations and closed 17, all classes.
YearFiledClosed
202687
202516
202420
202320
202232
201812
201710
Bedbug report
Filed May 28, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.

Hearings and penalties

OATH hearings
A hearing on a DOB summons is set for February 22, 2027.
OATH/ECB summonses
24 DOB and FDNY summonses here since January 1, 2019, with $60,475 in penalties imposed. 4 of them are still active, the same 4 listed under OATH/ECB. 13 judgments docketed, the latest on September 30, 2026. A docketed judgment shows up in a title search.
  • April 20, 2026, DOB: Fail to file amendment acceptable report to correct unsafe conditions. Decided by default, $6,250 penalty imposed.
  • January 8, 2026, DOB: Failure to provide unobstructed exit passageway. Decided by default, $6,250 penalty imposed.
  • July 25, 2025, DOB: Occupancy contrary to that allowed by certificate of occupancy or building department records. In violation, $2,500 penalty imposed.

The newest 3 of 24 summonses OATH lists here.

How a default is vacated

DOF tax lien sale
Listed for DOF's 2025 tax lien sale, for water and sewer charges only. The last list it appeared on was the 10-day notice of May 2025.

DOB records

DOB violations
11 active DOB violations. The newest was issued January 8, 2026.
DOB complaints
7 DOB complaints in the last 12 months. The newest was filed July 1, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
45 DOB complaints from 1990 through November 25, 2026. 47 DOB violations since 1990, 14 resolved and 22 dismissed in DOB's records.
DOB facade
Rated Unsafe in the latest facade report, filed January 7, 2026 (inspection cycle 9). 2 reports in this cycle have rated it Unsafe, the first filed December 14, 2022. Reports in earlier inspection cycles rated it Unsafe in 2007, Safe in 2009, Safe with a repair and maintenance program (SWARMP) in 2012, and Unsafe in 2018.
DOB permits
2 DOB work permits in effect. The latest, for Suspended Scaffold work, was issued May 19, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
  • Suspended Scaffold, issued May 19, 2026, in effect until December 9, 2026.
  • Mechanical Systems, issued April 28, 2026, signed off.
  • General Construction, issued January 20, 2026, in effect until December 9, 2026.

The newest 3 of 7 permits DOB NOW lists here.

Boiler inspection
Inspected April 27, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 90 Nassau St have open violations?

Yes. It had 4 open violations on November 25, 2026: 4 from OATH/ECB. None is Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 7 days, since November 18, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus HPD's building registrations, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOF's tax lien sale lists, DOB violations, DOB complaints, DOB facade filings, DOB NOW work permits, DOB boiler inspection reports, HPD's annual bedbug reports, the city's PLUTO tax-lot file and DOF's property sales records. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 90 Nassau St, Manhattan: 7 units, 4 open violations, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/90-nassau-street-manhattan

How we count: /method.

Is this your building?