Tax lot 1-00260-0001
En español: contando todos los años, el HPD tiene 1 violación abierta aquí, la más antigua del 25 de marzo de 2019.
- Built
- 1940
- Floors
- 6
- Residential units
- 813
- Building type
- Elevator building
- Zoning district
- R7-2
- Lot area
- 261,850 sq ft
- Floor area
- 513,000 sq ft
- Tax lot (BBL)
- 1-00260-0001
Counting every year, HPD has 1 violation still open here, the oldest filed on March 25, 2019. No Class B or C violation HPD filed here in the last 3 years is still open. No OATH/ECB summons issued in the last 3 years is still active.
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
Hearings and penalties
- OATH/ECB summonses
- 50 DOB and FDNY summonses here since January 1, 2019, with $11,500 in penalties imposed. 9 judgments docketed, the latest on June 30, 2026. A docketed judgment shows up in a title search.
- September 23, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation.
- January 21, 2026, FDNY: Fire protection systems. Decided by default, $1,000 penalty imposed.
- January 21, 2026, FDNY: Fire protection systems. In violation.
The newest 3 of 50 summonses OATH lists here.
DOB records
- DOB violations
- 4 active DOB violations, most of them for facade reports not filed or filed late. The newest was issued February 22, 2023.
- DOB, all years
- 55 DOB complaints from 2000 through November 25, 2026. 55 DOB violations since 1993, 1 resolved and 50 dismissed in DOB's records.
- DOB facade
- 10 buildings on this lot are rated Safe with a repair and maintenance program (SWARMP) in their latest facade reports, the newest filed October 31, 2023 (inspection cycle 9).
- DOB permits
- 6 DOB work permits in effect. The latest, for Solar work, was issued October 28, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Solar, issued October 28, 2026, in effect until May 10, 2027.
- Solar, issued October 26, 2026, in effect until May 10, 2027.
- Solar, issued October 26, 2026, in effect until May 10, 2027.
The newest 3 of 54 permits DOB NOW lists here.
- Boiler inspection
- 4 boilers, all inspected in 2026, the latest on September 16. Boilers in buildings with 6 or more apartments are inspected every calendar year.
HPD and other city records
- Local Law 97
- Covered as a city-owned or NYCHA building (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Tax exemption
- Has an NYC Housing Authority tax exemption (DOF 2026/27 roll).
The building report
- How it compares with the 799 Manhattan buildings with 200 or more apartments.
- All 54 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 50 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.