107 Sullivan St
Manhattan, NY 10012
107 Sullivan Street is a walk-up building with 37 apartments, built in 1905. It has 1 open violation. The oldest open HPD violation was filed on February 27, 2024.
En español: 1 violación abierta, ninguna de Clase C. La más antigua del HPD lleva 2 años abierta, desde el 27 de febrero de 2024.
Open now
- 1See it
OATH/ECB summons still active
Since November 27, 2023, certifications were filed on 7 Class C violations: 5 by the original certify-by date, 2 after it. HPD can grant a postponement, and this count uses the original date. A filing after that date may still have been on time. How certification works
- Zoning district
- R7-2
- Lot area
- 5,000 sq ft
- Floor area
- 22,517 sq ft
- Tax lot (BBL)
- 1-00503-0006
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| OATH/ECB | 1 open | ||
| Construction, Class 2 | Found in violation | 39106013H | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2019 to 2026, HPD filed 30 violations and closed 28, all classes.
Year Filed Closed 2026 2 9 2025 4 0 2024 14 10 2022 1 1 2021 0 5 2020 6 3 2019 3 0 - Bedbug report
- Filed December 16, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH/ECB summonses
- 2 DOB summonses here since January 1, 2019, with $625 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 1 judgment docketed, on April 30, 2025. A docketed judgment shows up in a title search.
- February 14, 2024, DOB: Failure to maintain building in code-compliant manner. In violation, $625 penalty imposed.
- June 6, 2022, DOB: Altered changed building occupied without a valid certificate of occupancy. Dismissed.
DOB records
- DOB, all years
- 22 DOB complaints from 1990 through November 25, 2026. 3 DOB violations since 1990, 3 dismissed in DOB's records.
- DOB permits
- 1 DOB work permit in effect, for General Construction work, issued September 14, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Plumbing, issued October 6, 2026, expired November 12, 2026.
- General Construction, issued September 14, 2026, in effect until December 30, 2026.
- Structural, issued October 16, 2024, signed off.
The newest 3 of 7 permits DOB NOW lists here.
- Boiler inspection
- Inspected October 21, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 1 open violation this page lists without it.
- What the one city status here means, and how many of these carry it.
- How it compares with the 6,540 Manhattan buildings with 20 to 49 apartments.
- All 7 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 2 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.