101 Warren St, Manhattan
- Built
- 2006
- Floors
- 32
- Residential units
- 381
- Building type
- Condominium
- Zoning district
- C6-4
- Lot area
- 90,565 sq ft
- Floor area
- 770,447 sq ft
En español: 1 violación de Clase C abierta (peligro inmediato). La más antigua del HPD lleva 3 meses abierta, desde el 29 de junio de 2026.
Open now
- 1Get it certified
Class C, immediately hazardous
Open violations are sitting, with little movement either way. 1 open Class C, with 0 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.
The original certify-by date on the open HPD violation, July 21, 2026, has passed. The report prints it beside the violation.
- OATH/ECB summonses
- 42 DOB and FDNY summonses here since January 1, 2019, with $39,985 in penalties imposed. 6 judgments docketed, the latest on February 28, 2023. A docketed judgment shows up in a title search.
- June 12, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms.
- May 4, 2026, FDNY: Portable fire extinguishers and fire hoses. Decided by default, $3,000 penalty imposed.
- April 17, 2026, FDNY: Recordkeeping.
The newest 3 of 42 summonses OATH lists here. The report lists all 42, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 1 active DOB violation, issued April 11, 2008.
- Housing court
- 2 housing court cases here since 2016, most of them tenant actions.
- DOB facade
- Rated SWARMP in the latest facade report, filed August 30, 2024 (inspection cycle 9). Reports in earlier inspection cycles rated it Unsafe in 2012, and Safe in 2018 and 2019. SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- 6 DOB work permits in effect. The latest, for General Construction work, was issued October 7, 2026.
- General Construction, issued October 7, 2026, in effect until December 1, 2026.
- Boiler Equipment, issued September 11, 2026, in effect until January 1, 2027.
- Mechanical Systems, issued September 11, 2026, signed off.
The newest 3 of 53 permits DOB NOW lists here. The report lists all 53, with job numbers and each job's estimated cost. What the report adds
- Certificate of occupancy
- Temporary, renewed July 13, 2026.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Bedbug report
- Filed December 20, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 1 open | |||
| Fire Safety | To be reinspected | 19048490 | The Warren Street Condominium | |
The full report on 101 Warren St, Manhattan
- All 1 open violation, each with the city's own words and the date on its notice.
- What the one city status here means, and how many of these carry it.
- How it compares with the 794 Manhattan buildings with 200 or more apartments.
- All 53 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 42 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 101 Warren St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.