208 West 80th St, Manhattan
- Built
- 1910
- Floors
- 5
- Residential units
- 20
- Building type
- Walk-up building
- Zoning district
- R8B
- Lot area
- 2,554 sq ft
- Floor area
- 9,660 sq ft
- Last sale
- $3,300,000
En español: 8 violaciones de Clase C abiertas (peligro inmediato) y 34 abiertas en total. La más antigua del HPD lleva 8 años abierta, desde el 30 de mayo de 2018.
Open now, most hazardous first
- 8Get these certified
Class C, immediately hazardous
- 26See the 26
Class B, hazardous
Open violations are sitting, with little movement either way. 8 open Class C, with 2 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.
Since October 12, 2023, certifications were filed on 9 Class C violations, all 9 by the original certify-by date. How certification works
The original certify-by dates on the 34 open HPD violations have all passed. The latest was August 13, 2026. The report prints the date beside each one.
- OATH/ECB summonses
- 2 DOB summonses here since January 1, 2019, with $1,250 in penalties imposed. 1 judgment docketed, on December 31, 2019. A docketed judgment shows up in a title search.
- August 9, 2019, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. Dismissed.
- May 21, 2019, DOB: Failure to provide unobstructed exit passageway. In violation, $1,250 penalty imposed.
- DOB violations
- 3 active DOB violations. The newest was issued March 3, 2015.
- Housing court
- 1 housing court case here, opened in 2025.
- DOB permits
- DOB NOW lists 2 work permits here, the newest issued April 17, 2025, for General Construction work.
- General Construction, issued April 17, 2025, signed off.
- Sidewalk Shed, issued April 3, 2025, expired April 3, 2026.
- Boiler inspection
- Inspected August 28, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
- Bedbug report
- Filed December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 8 open | ||
| Notice sent | 18442427 | ||
| Notice sent | 18442422 | ||
| Vermin / Infestation | Notice sent to tenant | 18442417 | |
| Notice sent | 18442413 | ||
| Notice sent | 18442411 | ||
| Vermin / Infestation | Notice sent to tenant | 18274266 | |
| Fire Safety | Notice sent | 18274264 | |
| Fire Safety | Not complied with | 17747722 | |
| Class B | 26 open | ||
| Notice sent | 19027193 | ||
| Notice sent | 19027192 | ||
| Notice sent | 19027190 | ||
| Notice sent | 19027189 | ||
| Notice sent | 19027187 | ||
| Notice sent | 18702350 | ||
| Notice sent | 18702344 | ||
| Notice sent | 18702342 | ||
| Notice sent | 18442426 | ||
| Notice sent | 18442425 | ||
| The report lists all 26, each with the city's own words and the date on its notice. What the report adds | |||
The full report on 208 West 80th St, Manhattan
- All 34 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 6,545 Manhattan buildings with 20 to 49 apartments.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 2 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 208 West 80th St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.