Tax lot 1-01684-0001
En español: 2 violaciones abiertas. La más antigua del HPD lleva 49 años abierta, desde el 20 de junio de 1977.
Open now
- 2See the 2
OATH/ECB summonses still active. Most often Construction.
- Built
- 1959
- Floors
- 14
- Residential units
- 794
- Building type
- Elevator building
- Zoning district
- R7-2
- Lot area
- 393,600 sq ft
- Floor area
- 714,550 sq ft
- Tax lot (BBL)
- 1-01684-0001
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| OATH/ECB | 2 open most often Construction | ||
| Construction, Class 1 | In violation (POP) | 35730136L | |
| Construction, Class 1 | In violation (POP) | 35726599X | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
Hearings and penalties
- OATH/ECB summonses
- 46 DOB and FDNY summonses here since January 1, 2019, with $37,500 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 2 judgments docketed, the latest on January 31, 2026. A docketed judgment shows up in a title search.
- October 14, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms. In violation.
- September 29, 2026, DOB: Failure to maintain building in code-compliant manner. In violation, $2,500 penalty imposed.
- June 24, 2026, DOB: Failure to maintain building in code-compliant manner. In violation, $2,500 penalty imposed.
The newest 3 of 46 summonses OATH lists here.
- Housing court
- 1 housing court case here, opened in 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 6 active DOB violations. The newest was issued February 22, 2022.
- DOB, all years
- 75 DOB complaints from 1991 through November 25, 2026. 148 DOB violations since 1989, 28 resolved and 114 dismissed in DOB's records.
- DOB facade
- 5 buildings on this lot are rated Unsafe in their latest facade reports, the newest filed July 1, 2026 (inspection cycle 10). 5 other buildings on this lot are rated Safe with a repair and maintenance program (SWARMP).
- DOB permits
- 10 DOB work permits in effect. The latest, for General Construction work, was issued October 30, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- General Construction, issued October 30, 2026, in effect until August 17, 2027.
- Plumbing, issued October 29, 2026, in effect until January 27, 2027.
- General Construction, issued October 14, 2026, in effect until June 1, 2027.
The newest 3 of 33 permits DOB NOW lists here.
- Boiler inspection
- 5 boilers, all inspected in 2026, the latest on January 6. Boilers in buildings with 6 or more apartments are inspected every calendar year.
HPD and other city records
- Energy benchmarking
- ENERGY STAR score 11 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered as a city-owned or NYCHA building (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Tax exemption
- Has an NYC Housing Authority tax exemption (DOF 2026/27 roll).
The building report
- The city's wording on the 2 open violations this page lists without it.
- What the one city status here means, and how many of these carry it.
- How it compares with the 799 Manhattan buildings with 200 or more apartments.
- All 33 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 46 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 2 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.