750 Riverside Dr, Manhattan
- Built
- 1920
- Floors
- 6
- Residential units
- 42
- Building type
- Condominium
- Zoning district
- R8
- Lot area
- 8,811 sq ft
- Floor area
- 30,498 sq ft
En español: 1 violación de Clase C abierta (peligro inmediato). La más antigua del HPD lleva 11 años abierta, desde el 3 de agosto de 2015.
Open now
- 1Get it certified
Class C, immediately hazardous
Open violations are sitting, with little movement either way. 1 open Class C, with nothing filed or new in the last 180 days.
Since October 12, 2023, certifications were filed on 3 Class C violations, all 3 by the original certify-by date. HPD now marks 1 of them Invalid Certification. How certification works
The original certify-by date on the open HPD violation, November 30, 2023, has passed. The report prints it beside the violation.
- OATH/ECB summonses
- 18 DOB and FDNY summonses here since January 1, 2019, with $13,597 in penalties imposed. 6 judgments docketed, the latest on July 31, 2026. A docketed judgment shows up in a title search.
- February 11, 2026, FDNY: Inspection and testing. In violation, $300 penalty imposed.
- October 13, 2023, DOB: Unapproved unsafe unsuitable electrical equipment or wiring in use. Dismissed.
- March 30, 2023, DOB: Failure to maintain adequate housekeeping per section requirements. Dismissed.
The newest 3 of 18 summonses OATH lists here. The report lists all 18, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 1 active DOB violation, issued February 22, 2022.
- Housing court
- 3 housing court cases here since 2005, most of them tenant actions.
- DOB facade
- Rated Safe in the latest facade report, filed July 1, 2022 (inspection cycle 9). Reports in earlier inspection cycles rated it SWARMP in 2007, Safe in 2012, and SWARMP in 2017. SWARMP means safe with a repair and maintenance program.
- DOB permits
- DOB NOW lists 11 work permits here, the newest issued August 14, 2025, for Suspended Scaffold work.
- Suspended Scaffold, issued August 14, 2025, signed off.
- General Construction, issued July 16, 2025, signed off.
- Sidewalk Shed, issued July 8, 2025, signed off.
The newest 3 of 11 permits DOB NOW lists here. The report lists all 11, with job numbers and each job's estimated cost. What the report adds
- Energy benchmarking
- ENERGY STAR score 14 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026).
- Bedbug report
- Filed June 29, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair order
- 1 completed HPD emergency repair order since October 12, 2023: a lead paint order, opened November 9, 2023, awarded for $1,296.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 1 open | ||
| Invalid certification | 16382534 | ||
The full report on 750 Riverside Dr, Manhattan
- All 1 open violation, each with the city's own words and the date on its notice.
- What the one city status here means, and how many of these carry it.
- How it compares with the 6,545 Manhattan buildings with 20 to 49 apartments.
- All 11 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 18 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 750 Riverside Dr, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.