909 Sheridan Ave, Bronx
- Built
- 1938
- Floors
- 7
- Residential units
- 62
- Building type
- Elevator building
- Zoning district
- R8
- Lot area
- 16,116 sq ft
- Floor area
- 77,050 sq ft
- Last sale
- $12,383,705
En español: 2 violaciones de Clase C abiertas (peligro inmediato) y 5 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 14 de junio de 2023.
Open now, most hazardous first
- 2Get these certified
Class C, immediately hazardous. Most often Vermin / Infestation.
- 1See it
Class B, hazardous
- 2See the 2
OATH/ECB summonses still active
Open violations are sitting, with little movement either way. 2 open Class C, with nothing filed or new in the last 180 days.
Since October 12, 2023, certifications were filed on 2 Class C violations, all 2 by the original certify-by date. How certification works
The original certify-by dates on the 3 open HPD violations have all passed. The latest was November 17, 2025. The report prints the date beside each one.
- OATH/ECB summonses
- 6 DOB and FDNY summonses here since January 1, 2019, with $14,100 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 3 judgments docketed, the latest on July 31, 2025. A docketed judgment shows up in a title search.
- August 13, 2026, FDNY: Recordkeeping. In violation.
- April 8, 2025, DOB: Failure to submit required report of critical examination. Decided by default, $10,000 penalty imposed.
- January 24, 2025, DOB: Failure to maintain building in code-compliant manner. Decided by default, $3,125 penalty imposed.
The newest 3 of 6 summonses OATH lists here. The report lists all 6, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOF tax lien sale
- Listed for DOF's 2025 tax lien sale, for water and sewer charges only. The last list it appeared on was the 10-day notice of May 2025.
- DOB violations
- 3 active DOB violations. The newest was issued February 22, 2024.
- Housing court
- 2 housing court cases here since 2023, most of them tenant actions.
- DOB facade
- No Report Filed for inspection cycle 9. Reports in earlier inspection cycles rated it Unsafe in 2007, Safe in 2009, SWARMP in 2012, and Safe in 2017. SWARMP means safe with a repair and maintenance program. Need this filed?
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected February 1, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed May 7, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 5 completed HPD emergency repair orders since October 12, 2023, awarded for $9,362 in total. The most recent of the 5, a general construction order, was opened December 30, 2025.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 2 open most often Vermin / Infestation | ||
| Vermin / Infestation | Defect letter sent | 17146449 | |
| Vermin / Infestation | Defect letter sent | 16852923 | |
| Class B | 1 open | ||
| No access to reinspect (first try) | 18258732 | ||
| OATH/ECB | 2 open | ||
| Local Law, Class 2 | Decided by default | 37034738M | |
| Construction, Class 2 | Decided by default | 39136386H | |
The full report on 909 Sheridan Ave, Bronx
- All 5 open violations, each with the city's own words and the date on its notice.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 1,979 Bronx buildings with 50 to 99 apartments.
- All 6 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 2 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 909 Sheridan Ave, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.