Tax lot 2-02808-0021
En español: 3 violaciones abiertas. La más antigua del HPD lleva 7 años abierta, desde el 8 de julio de 2019.
Open now
- 3See the 3
OATH/ECB summonses still active. Most often Construction.
- Built
- 1920
- Floors
- 2
- Building type
- Indoor public or cultural facility
- Zoning district
- R8
- Lot area
- 10,895 sq ft
- Floor area
- 13,100 sq ft
- Tax lot (BBL)
- 2-02808-0021
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| OATH/ECB | 3 open most often Construction | ||
| Construction, Class 3 | Decided by default | 39150479H | |
| Boilers, Class 2 | Decided by default | 37031819K | |
| Construction, Class 2 | Decided by default | 39112835H | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2019 to 2021, HPD filed 46 violations and closed 2, all classes.
Year Filed Closed 2021 15 2 2020 9 0 2019 22 0
Hearings and penalties
- OATH/ECB summonses
- 11 DOB summonses here since January 1, 2019, with $63,000 in penalties imposed. 3 of them are still active, the same 3 listed under OATH/ECB. 8 judgments docketed, the latest on November 30, 2025. A docketed judgment shows up in a title search.
- June 9, 2025, DOB: Occupancy contrary to that allowed by certificate of occupancy and building department. Decided by default, $500 penalty imposed.
- December 16, 2024, DOB: Failure to file complete boiler inspection report. Decided by default, $3,125 penalty imposed.
- April 26, 2024, DOB: Failure to maintain building in code-compliant manner. Decided by default, $3,125 penalty imposed.
The newest 3 of 11 summonses OATH lists here.
- Housing court
- 6 housing court cases here since 2018, most of them tenant actions. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 21 active DOB violations. The newest was issued November 14, 2025.
- DOB complaints
- 4 DOB complaints in the last 12 months. The newest was filed November 13, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 54 DOB complaints from 1991 through November 25, 2026. 25 DOB violations since 1990, 4 dismissed in DOB's records.
- DOB permits
- 2 DOB work permits in effect. The latest, for Full Demolition work, was issued November 16, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Full Demolition, issued November 16, 2026, in effect until December 28, 2026.
- Construction Fence, issued October 29, 2026, in effect until March 21, 2027.
- Construction Fence, issued May 15, 2023, signed off.
The building report
- The city's wording on the 3 open violations this page lists without it.
- What the one city status here means, and how many of these carry it.
- All 3 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 11 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 3 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.