Skip to content
Buildings150 Vernon Avenue, BrooklynCurrent through

150 Vernon Ave, Brooklyn

BBL 3-01760-0007

Built
1931
Floors
4
Building type
Asylum or home
Zoning district
R6A
Lot area
8,400 sq ft
Floor area
11,525 sq ft
Last sale
$6,650,000

En español: sin violaciones abiertas del HPD, contando todos los años.

Is this your building?

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list. We reply within one business day.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report puts every record on this page on a cover you can forward. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH/ECB summonses
11 FDNY summonses here since January 1, 2019, with $12,500 in penalties imposed. 2 judgments docketed, the latest on October 31, 2021. A docketed judgment shows up in a title search.
  • August 17, 2026, FDNY: Fire protection systems: Fail to prevent unnecessary unwarranted alarms.
  • February 4, 2026, FDNY: Sign, postings, notices and instructions. Decided by default, $3,000 penalty imposed.
  • January 5, 2026, FDNY: Inspection and testing. Decided by default, $1,000 penalty imposed.

The newest 3 of 11 summonses OATH lists here. The report lists all 11, with each outcome, the penalty imposed and any docketing date. What the report adds

How a default is vacated

DOB violations
1 active DOB violation, issued August 16, 1993.
Boiler inspection
Inspected August 14, 2026.
Bedbug report
Filed August 18, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.

No open HPD violations, counting every year. No OATH/ECB summons issued in the last 3 years is still active.

The full report on 150 Vernon Ave, Brooklyn

Get the report on 150 Vernon Ave, Brooklyn, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 150 Vernon Avenue, Brooklyn have open violations?

No. On October 10, 2026, 150 Vernon Avenue, Brooklyn had no open HPD violations, counting every year, and no OATH/ECB summons issued in the last 3 years was still active.

Does 150 Vernon Avenue, Brooklyn have active DOB violations?

Yes. 1 active DOB violation, issued August 16, 1993. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

When was the boiler at 150 Vernon Avenue, Brooklyn last inspected?

On August 14, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 150 Vernon Avenue, Brooklyn last file its bedbug report?

On August 18, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

When was 150 Vernon Avenue, Brooklyn built?

The city's record gives 1931 as the year 150 Vernon Avenue, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an asylum or home with 4 floors.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOB violations, DOB boiler inspection reports, HPD's annual bedbug reports, the city's PLUTO tax-lot file and DOF's property sales records. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOB violations, DOB boiler inspection reports, HPD's annual bedbug reports, the city's PLUTO tax-lot file and DOF's property sales records. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 150 Vernon Ave, Brooklyn: 1 active DOB violation, from New York City's HPD violation, DOB violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/150-vernon-avenue-brooklyn

How we count: /method.

Is this your building?