3301 Farragut Rd, Brooklyn
- Built
- 1925
- Floors
- 4
- Residential units
- 42
- Building type
- Walk-up building
- Zoning district
- R6
- Lot area
- 10,000 sq ft
- Floor area
- 36,000 sq ft
- Last sale
- $3,070,786
En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 18 abiertas en total. La más antigua del HPD lleva 6 años abierta, desde el 25 de septiembre de 2020.
Open now, most hazardous first
- 10Get these certified
Class C, immediately hazardous. Most often Lead Paint.
- 8See the 8
Class B, hazardous
Open violations are sitting, with little movement either way. 10 open Class C, with 0 certifications filed and 3 new Class C in the last 180 days, too few to call a direction.
Since October 12, 2023, certifications were filed on 14 Class C violations, all 14 by the original certify-by date. How certification works
The original certify-by dates on the 18 open HPD violations run from May 19, 2025 to November 17, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 9 on September 24, 2026 and 10 on October 8.
- OATH/ECB summonses
- 2 FDNY summonses here since January 1, 2019, with $2,000 in penalties imposed. 1 judgment docketed, on January 31, 2022. A docketed judgment shows up in a title search.
- August 27, 2021, FDNY: Fire-rated construction. Decided by default, $2,000 penalty imposed.
- April 15, 2019, FDNY: Fire-rated construction. In violation.
- Housing court
- 10 housing court cases here since 2007, most of them tenant actions.
- Energy benchmarking
- ENERGY STAR score 12 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected September 4, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
- Bedbug report
- Filed December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 10 open most often Lead Paint | |||
| Vermin / Infestation | Notice sent to tenant | 19255448 | ||
| Notice sent | 19115255 | FLGSP 3301 Farragut Rd LLC | ||
| Vermin / Infestation | Notice sent to tenant | 19115253 | FLGSP 3301 Farragut Rd LLC | |
| Lead Paint | No access to reinspect (first try) | 18222781 | ||
| Lead Paint | No access to reinspect (first try) | 18222779 | ||
| Lead Paint | Defect letter sent | 18214657 | ||
| Lead Paint | Defect letter sent | 18214656 | ||
| Lead Paint | Defect letter sent | 18214655 | ||
| Lead Paint | Defect letter sent | 18214654 | ||
| Lead Paint | Defect letter sent | 18214653 | ||
| Class B | 8 open | |||
| Notice sent | 19255447 | |||
| Notice sent | 19255446 | |||
| Notice sent | 19115258 | FLGSP 3301 Farragut Rd LLC | ||
| Notice sent | 19115257 | FLGSP 3301 Farragut Rd LLC | ||
| Notice sent | 19104287 | FLGSP 3301 Farragut Rd LLC | ||
| Notice sent | 19104275 | FLGSP 3301 Farragut Rd LLC | ||
| Mold | No access to reinspect (second try) | 18298152 | ||
| Not complied with | 17789616 | |||
The full report on 3301 Farragut Rd, Brooklyn
- All 18 open violations, each with the city's own words and the date on its notice.
- What each of the 6 city statuses here means, and how many of these carry it.
- How it compares with the 4,010 Brooklyn buildings with 20 to 49 apartments.
- All 2 FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 3301 Farragut Rd, Brooklyn, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.