Skip to content
ViolationScout4 open Class C, with nothing filed or new in the last 180 days.Your building
Buildings2567 Bedford Avenue, BrooklynCurrent through

2567 Bedford Ave, Brooklyn

BBL 3-05190-0050

Built
1931
Floors
4
Residential units
8
Building type
Walk-up building
Zoning district
R6
Lot area
2,033 sq ft
Floor area
6,720 sq ft

En español: 4 violaciones de Clase C abiertas (peligro inmediato) y 6 abiertas en total. La más antigua del HPD lleva 7 años abierta, desde el 13 de diciembre de 2018.

Open now, most hazardous first

  1. 4

    Class C, immediately hazardous. Most often Vermin / Infestation.

    8 open counting every year, the oldest since

    Get these certified
  2. 2

    Class B, hazardous

    See the 2

Open violations are sitting, with little movement either way. 4 open Class C, with nothing filed or new in the last 180 days.

Since October 12, 2023, certifications were filed on 2 Class C violations, all 2 by the original certify-by date. How certification works

The original certify-by dates on the 6 open HPD violations have all passed. The latest was March 23, 2026. The report prints the date beside each one.

Is this your building?

4 open Class C. The oldest open HPD violation was filed December 13, 2018.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH/ECB summonses
4 FDNY summonses here since January 1, 2019, with $4,000 in penalties imposed. 3 judgments docketed, the latest on January 31, 2026. A docketed judgment shows up in a title search.
  • December 29, 2025, FDNY: Inspection and testing. Decided by default, $1,000 penalty imposed.
  • August 20, 2025, FDNY: Inspection and testing. Decided by default, $1,000 penalty imposed.
  • October 29, 2024, FDNY: Inspection and testing. Decided by default, $1,000 penalty imposed.

The newest 3 of 4 summonses OATH lists here. The report lists all 4, with each outcome, the penalty imposed and any docketing date. What the report adds

How a default is vacated

DOB violations
3 active DOB violations. The newest was issued November 14, 2025.
Housing court
1 housing court case here, opened in 2017.
Boiler inspection
Inspected June 4, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
Bedbug report
Filed May 27, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C4 open most often Vermin / Infestation
Vermin / InfestationNotice sent to tenant18609029SADY REALTY
Vermin / InfestationNotice sent17425640
Fire SafetyNotice sent17425639
Vermin / InfestationNotice sent to tenant17425638
Class B2 open
Invalid certification18609031SADY REALTY
Invalid certification18609030SADY REALTY

The full report on 2567 Bedford Ave, Brooklyn

Get the report on 2567 Bedford Ave, Brooklyn, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 2567 Bedford Avenue, Brooklyn have open violations?

Yes. 2567 Bedford Avenue, Brooklyn had 6 open violations on October 10, 2026: 6 from HPD. 4 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 7 years, since December 13, 2018.

Is 2567 Bedford Avenue, Brooklyn getting better or worse?

Open violations are sitting, with little movement either way. 4 open Class C, with nothing filed or new in the last 180 days. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 2567 Bedford Avenue, Brooklyn?

Since October 12, 2023, certifications were filed on 2 Class C violations, all 2 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 2567 Bedford Avenue, Brooklyn have active DOB violations?

Yes. 3 active DOB violations. The newest was issued November 14, 2025. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has 2567 Bedford Avenue, Brooklyn been in housing court?

Yes. 1 housing court case here, opened in 2017. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

When was the boiler at 2567 Bedford Avenue, Brooklyn last inspected?

On June 4, 2025. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 2567 Bedford Avenue, Brooklyn last file its bedbug report?

On May 27, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 2567 Bedford Avenue, Brooklyn rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 2567 Bedford Avenue, Brooklyn built?

The city's record gives 1931 as the year 2567 Bedford Avenue, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up building with 4 floors.

How many apartments does 2567 Bedford Avenue, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 8 residential units at 2567 Bedford Avenue, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 2567 Bedford Ave, Brooklyn: 8 units, 4 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/2567-bedford-avenue-brooklyn

How we count: /method.

Is this your building?