66-20 Wetherole St, Queens
- Built
- 1948
- Floors
- 6
- Residential units
- 75
- Building type
- Elevator building
- Zoning district
- R7-1
- Lot area
- 22,795 sq ft
- Floor area
- 75,216 sq ft
En español: 1 violación abierta. La más antigua del HPD lleva 16 años abierta, desde el 21 de agosto de 2010.
Open now
- 1See it
OATH/ECB summons still active
Since October 12, 2023, certifications were filed on 5 Class C violations, all 5 by the original certify-by date. How certification works
- OATH/ECB summonses
- 9 DOB and FDNY summonses here since January 1, 2019, with $16,280 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 1 judgment docketed, on August 31, 2024. A docketed judgment shows up in a title search.
- March 3, 2026, DOB: Failure to maintain building in code-compliant manner. In violation.
- March 3, 2026, DOB: Electrical work without a permit. In violation, $625 penalty imposed.
- February 21, 2025, FDNY: Sign, postings, notices and instructions. In violation.
The newest 3 of 9 summonses OATH lists here. The report lists all 9, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 4 active DOB violations. The newest was issued March 6, 2024.
- Housing court
- 3 housing court cases here since 2014, most of them tenant actions.
- DOB complaints
- 1 DOB complaint in the 12 months to September 25, 2026. It was filed March 2, 2026.
- DOB facade
- Rated Safe in the latest facade report, filed August 8, 2025 (inspection cycle 10). Reports in earlier inspection cycles rated it Safe in 2006 and 2012, Unsafe in 2024, and Safe in 2025.
- DOB permits
- DOB NOW lists 2 work permits here, the newest issued June 13, 2024, for Sidewalk Shed work.
- Sidewalk Shed, issued June 13, 2024, signed off.
- General Construction, issued April 2, 2024, signed off.
- Energy benchmarking
- ENERGY STAR score 67 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected June 2, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed February 10, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| OATH/ECB | 1 open | ||
| Elevators, Class 1 | Admitted | 39102656N | |
The full report on 66-20 Wetherole St, Queens
- All 1 open violation, each with the city's own words and the date on its notice.
- What the one city status here means, and how many of these carry it.
- How it compares with the 1,253 Queens buildings with 50 to 99 apartments.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 9 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 66-20 Wetherole St, Queens, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.