Skip to content
Buildings245-30 Grand Central Parkway, QueensCurrent through

245-30 Grand Central Pkwy, Queens

BBL 4-08401-0600

Built
1966
Floors
6
Residential units
240
Building type
Elevator building
Zoning district
R6A
Lot area
153,000 sq ft
Floor area
263,883 sq ft

En español: contando todos los años, el HPD tiene 1 violación abierta aquí, la más antigua del 22 de agosto de 2023.

Since October 12, 2023, certifications were filed on 15 Class C violations: 14 by the original certify-by date, 1 after it. How certification works

Is this your building?

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list. We reply within one business day.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH/ECB summonses
3 DOB and FDNY summonses here since January 1, 2019, with $3,500 in penalties imposed. 1 judgment docketed, on January 31, 2025. A docketed judgment shows up in a title search.
  • August 3, 2024, FDNY: Portable fire extinguishers and fire hoses. Decided by default, $1,000 penalty imposed.
  • February 13, 2020, DOB: Fail submit required report of critical examination documenting exterior wall. Admitted, $1,250 penalty imposed.
  • February 13, 2020, DOB: Fail submit required report of critical examination documenting exterior wall. Admitted, $1,250 penalty imposed.

How a default is vacated

DOB violations
3 active DOB violations. The newest was issued October 27, 2020.
Housing court
3 housing court cases here since 2018.
DOB complaints
2 DOB complaints in the 12 months to September 25, 2026. The newest was filed July 5, 2026.
DOB facade
2 buildings on this lot are rated Safe in their latest facade reports, the newest filed February 21, 2024 (inspection cycle 9).
DOB permits
DOB NOW lists 15 work permits here, the newest issued September 8, 2023, for General Construction work.
  • General Construction, issued September 8, 2023, signed off.
  • Structural, issued September 8, 2023, signed off.
  • Antenna, issued January 17, 2023, signed off.

The newest 3 of 15 permits DOB NOW lists here. The report lists all 15, with job numbers and each job's estimated cost. What the report adds

Certificate of occupancy
Final, issued August 17, 2021.
Local Law 97
On the covered list (DOB's list, March 1, 2026).
Boiler inspection
2 boilers, both inspected in 2026, the latest on April 28. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed for its 2 buildings by December 17, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Counting every year, HPD has 1 violation still open here, the oldest filed on August 22, 2023. No Class B or C violation HPD filed here in the last 3 years is still open. No OATH/ECB summons issued in the last 3 years is still active.

The full report on 245-30 Grand Central Pkwy, Queens

Get the report on 245-30 Grand Central Pkwy, Queens, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Questions about this building

Does 245-30 Grand Central Parkway, Queens have open violations?

Yes. On October 10, 2026, counting every year, HPD had 1 violation still open at 245-30 Grand Central Parkway, Queens, the oldest filed on August 22, 2023. None was a Class B or C violation filed in the last 3 years, and no OATH/ECB summons issued in the last 3 years was still active.

When were certifications filed on Class C violations at 245-30 Grand Central Parkway, Queens?

Since October 12, 2023, certifications were filed on 15 Class C violations: 14 by the original certify-by date, 1 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 245-30 Grand Central Parkway, Queens have active DOB violations?

Yes. 3 active DOB violations. The newest was issued October 27, 2020. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has 245-30 Grand Central Parkway, Queens been in housing court?

Yes. 3 housing court cases here since 2018. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 245-30 Grand Central Parkway, Queens?

Yes. 2 DOB complaints in the 12 months to September 25, 2026. The newest was filed July 5, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade reports find at 245-30 Grand Central Parkway, Queens?

2 buildings on this lot are rated Safe in their latest facade reports, the newest filed February 21, 2024 (inspection cycle 9). Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Does 245-30 Grand Central Parkway, Queens have a certificate of occupancy?

Its latest certificate of occupancy is a final one, issued August 17, 2021. A certificate of occupancy says how a building may be used and occupied. A temporary one lets people move in while work finishes and has to be renewed until DOB issues the final one. DOB's records here start in July 2012, so an older certificate may not show.

When was the boiler at 245-30 Grand Central Parkway, Queens last inspected?

It has 2 boilers, both inspected in 2026, the latest on April 28. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 245-30 Grand Central Parkway, Queens last file its bedbug report?

Its 2 buildings had all filed by December 17, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 245-30 Grand Central Parkway, Queens covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. On the covered list (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 245-30 Grand Central Parkway, Queens rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 245-30 Grand Central Parkway, Queens built?

The city's record gives 1966 as the year 245-30 Grand Central Parkway, Queens was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 6 floors.

How many apartments does 245-30 Grand Central Parkway, Queens have?

The Department of City Planning's PLUTO tax-lot file lists 240 residential units at 245-30 Grand Central Parkway, Queens. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, DOB certificates of occupancy, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, DOB certificates of occupancy, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 245-30 Grand Central Pkwy, Queens: 1 open HPD violation, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/245-30-grand-central-parkway-queens

How we count: /method.

Is this your building?