490 West 187th St, Manhattan
- Built
- 1938
- Floors
- 6
- Residential units
- 58
- Building type
- Elevator building
- Zoning district
- R7-2
- Lot area
- 15,840 sq ft
- Floor area
- 61,150 sq ft
En español: 8 violaciones de Clase C abiertas (peligro inmediato) y 14 abiertas en total. La más antigua del HPD lleva 36 años abierta, desde el 10 de mayo de 1990.
Open now, most hazardous first
- 8Get these certified
Class C, immediately hazardous
- 6See the 6
Class B, hazardous
Open violations are sitting, with little movement either way. 8 open Class C, with 1 certification filed and 0 new Class C in the last 180 days, too few to call a direction.
Since October 12, 2023, certifications were filed on 21 Class C violations: 13 by the original certify-by date, 8 after it. How certification works
The original certify-by dates on the 14 open HPD violations have all passed. The latest was September 9, 2025. The report prints the date beside each one.
- OATH/ECB summonses
- 8 DOB and FDNY summonses here since January 1, 2019, with $3,362 in penalties imposed. 1 judgment docketed, on June 30, 2026. A docketed judgment shows up in a title search.
- January 5, 2026, FDNY: General maintenance. In violation, $1,325 penalty imposed.
- July 22, 2025, DOB: Failure to maintain elevator or conveying system. In violation.
- July 12, 2025, FDNY: General maintenance. In violation.
The newest 3 of 8 summonses OATH lists here. The report lists all 8, with each outcome, the penalty imposed and any docketing date. What the report adds
- Housing court
- 11 housing court cases here since 2005.
- DOB facade
- Rated SWARMP in the latest facade report, filed October 10, 2025 (inspection cycle 10). Reports in earlier inspection cycles rated it Safe in 2007, SWARMP in 2012, and Safe in 2018 and 2021. SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- 3 DOB work permits in effect. The latest, for Plumbing work, was issued October 5, 2026.
- Plumbing, issued October 5, 2026, in effect until February 8, 2027.
- Mechanical Systems, issued September 9, 2026, in effect until February 1, 2027.
- Mechanical Systems, issued July 10, 2026, in effect until June 30, 2027.
The newest 3 of 4 permits DOB NOW lists here. The report lists all 4, with job numbers and each job's estimated cost. What the report adds
- Energy benchmarking
- ENERGY STAR score 37 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected March 25, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 10, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 3 completed HPD emergency repair orders since October 12, 2023, awarded for $1,079 in total. The most recent of the 3, a general construction order, was opened June 4, 2025.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 8 open | |||
| Lead Paint | No access to reinspect (first try) | 18156946 | 490 REALTY LLC | |
| Lead Paint | No access to reinspect (first try) | 18143053 | 490 REALTY LLC | |
| Lead Paint | No access to reinspect (first try) | 18143052 | 490 REALTY LLC | |
| Vermin / Infestation | No access to reinspect (first try) | 18137544 | 490 REALTY LLC | |
| Vermin / Infestation | No access to reinspect (first try) | 17663477 | ||
| Fire Safety | No access to reinspect (first try) | 16773148 | ||
| Heat / Hot Water | No access to reinspect (first try) | 16767053 | ||
| Vermin / Infestation | No access to reinspect (first try) | 16690273 | ||
| Class B | 6 open | |||
| Not complied with | 17138922 | |||
| No access to reinspect (first try) | 16767054 | |||
| No access to reinspect (first try) | 16690274 | |||
| No access to reinspect (first try) | 16314713 | |||
| No access to reinspect (first try) | 16314711 | |||
| No access to reinspect (first try) | 16314710 | |||
The full report on 490 West 187th St, Manhattan
- All 14 open violations, each with the city's own words and the date on its notice.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 2,038 Manhattan buildings with 50 to 99 apartments.
- All 4 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 8 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 490 West 187th St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.