7 Stratford Ave, Staten Island
- Built
- 1951
- Floors
- 2
- Residential units
- 251
- Building type
- Walk-up building
- Zoning district
- R4
- Lot area
- 400,000 sq ft
- Floor area
- 198,384 sq ft
En español: 6 violaciones de Clase C abiertas (peligro inmediato) y 8 abiertas en total. La más antigua del HPD lleva 35 años abierta, desde el 22 de octubre de 1990.
Open now, most hazardous first
- 6Get these certified
Class C, immediately hazardous. Most often Vermin / Infestation.
- 2See the 2
Class B, hazardous
Certifications are being filed faster than new violations come in. 9 certifications filed against 2 new Class C in the last 180 days.
Since October 12, 2023, certifications were filed on 15 Class C violations: 13 by the original certify-by date, 2 after it. HPD now marks 2 of them False Certification. How certification works
The original certify-by dates on the 8 open HPD violations run from August 8, 2025 to October 29, 2026. The report prints the date beside each one.
- OATH/ECB summonses
- 9 DOB and FDNY summonses here since January 1, 2019, with $1,300 in penalties imposed.
- May 26, 2026, FDNY: Labels markings. In violation.
- May 26, 2026, FDNY: Affidavits, design installation documents, and other documentation.
- February 18, 2026, FDNY: Certificates of fitness and certificates of qualification. Decided by default, $1,000 penalty imposed.
The newest 3 of 9 summonses OATH lists here. The report lists all 9, with each outcome, the penalty imposed and any docketing date. What the report adds
- Housing court
- 12 housing court cases here since 2005.
- DOB complaints
- 2 DOB complaints in the 12 months to September 25, 2026. The newest was filed February 25, 2026.
- DOB permits
- DOB NOW lists 1 work permit here: Solar, issued February 27, 2025, signed off.
- Local Law 97
- On the covered list (DOB's list, March 1, 2026).
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on July 28. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed for its 58 buildings by January 5, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair order
- 1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened February 21, 2024, awarded for $649.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 6 open most often Vermin / Infestation | |||
| Vermin / Infestation | False certification | 18817751 | GRYMES HILL APARTMENTS DEL LLC | |
| Vermin / Infestation | False certification | 18817750 | GRYMES HILL APARTMENTS DEL LLC | |
| Vermin / Infestation | Notice sent to tenant | 18250542 | ||
| Vermin / Infestation | Not complied with | 18075636 | ||
| Vermin / Infestation | Not complied with | 18075635 | ||
| Fire Safety | Notice sent | 16948410 | ||
| Class B | 2 open | |||
| Notice sent | 19203687 | |||
| Notice sent | 18817852 | GRYMES HILL APARTMENTS DEL LLC | ||
The full report on 7 Stratford Ave, Staten Island
- All 8 open violations, each with the city's own words and the date on its notice.
- What each of the 4 city statuses here means, and how many of these carry it.
- All 1 DOB NOW work permit, with job numbers and each job's estimated cost.
- All 9 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 7 Stratford Ave, Staten Island, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.