90 Nassau St, Manhattan
- Built
- 1900
- Floors
- 8
- Residential units
- 7
- Building type
- Elevator building
- Zoning district
- C5-5
- Lot area
- 1,594 sq ft
- Floor area
- 12,560 sq ft
- Last sale
- $10,250,000
En español: 4 violaciones abiertas, ninguna de Clase C.
Open now
- 4See the 4
OATH/ECB summonses still active. Most often Construction.
- OATH hearings
- A hearing on a DOB summons is set for February 22, 2027.
- OATH/ECB summonses
- 24 DOB and FDNY summonses here since January 1, 2019, with $61,725 in penalties imposed. 4 of them are still active, the same 4 listed under OATH/ECB. 13 judgments docketed, the latest on September 30, 2026. A docketed judgment shows up in a title search.
- April 20, 2026, DOB: Fail to file amendment acceptable report to correct unsafe conditions. Decided by default, $6,250 penalty imposed.
- January 8, 2026, DOB: Failure to provide unobstructed exit passageway. Decided by default, $6,250 penalty imposed.
- July 25, 2025, DOB: Occupancy contrary to that allowed by certificate of occupancy or building department records. In violation, $2,500 penalty imposed.
The newest 3 of 24 summonses OATH lists here. The report lists all 24, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOF tax lien sale
- Listed for DOF's 2025 tax lien sale, for water and sewer charges only. The last list it appeared on was the 10-day notice of May 2025.
- DOB violations
- 12 active DOB violations. The newest was issued January 8, 2026.
- DOB complaints
- 7 DOB complaints in the 12 months to September 25, 2026. The newest was filed July 1, 2026.
- DOB facade
- Rated Unsafe in the latest facade report, filed January 7, 2026 (inspection cycle 9). 2 reports in this cycle have rated it Unsafe, the first filed December 14, 2022. Reports in earlier inspection cycles rated it Unsafe in 2007, Safe in 2009, SWARMP in 2012, and Unsafe in 2018. SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- 4 DOB work permits in effect. The latest, for Suspended Scaffold work, was issued May 19, 2026.
- Suspended Scaffold, issued May 19, 2026, in effect until December 9, 2026.
- Mechanical Systems, issued April 28, 2026, signed off.
- General Construction, issued January 20, 2026, in effect until December 9, 2026.
The newest 3 of 7 permits DOB NOW lists here. The report lists all 7, with job numbers and each job's estimated cost. What the report adds
- Boiler inspection
- Inspected April 27, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed May 28, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| OATH/ECB | 4 open most often Construction | |||
| Local Law, Class 2 | Decided by default | 37036672H | BERNART CAPITAL LLC | |
| Construction, Class 1 | Found in violation | 39155012R | ||
| Construction, Class 1 | Found in violation | 39155011P | ||
| Construction, Class 2 | Hearing pending | 39134328K | ||
The full report on 90 Nassau St, Manhattan
- All 4 open violations, each with the city's own words and the date on its notice.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 11,097 Manhattan buildings with 6 to 19 apartments.
- All 7 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 24 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 4 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 90 Nassau St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.