Skip to content
ViolationScout2 open Class C, with nothing filed or new in the last 180 days.Your building
Buildings909 Sheridan Avenue, BronxCurrent through

909 Sheridan Ave, Bronx

BBL 2-02461-0035 Grand Concourse Historic District

Built
1938
Floors
7
Residential units
62
Building type
Elevator building
Zoning district
R8
Lot area
16,116 sq ft
Floor area
77,050 sq ft
Last sale
$12,383,705

En español: 2 violaciones de Clase C abiertas (peligro inmediato) y 5 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 14 de junio de 2023.

Open now, most hazardous first

  1. 2

    Class C, immediately hazardous. Most often Vermin / Infestation.

    6 open counting every year, the oldest since

    Get these certified
  2. 1

    Class B, hazardous

    See it
  3. 2

    OATH/ECB summonses still active

    See the 2

Open violations are sitting, with little movement either way. 2 open Class C, with nothing filed or new in the last 180 days.

Since October 12, 2023, certifications were filed on 2 Class C violations, all 2 by the original certify-by date. How certification works

The original certify-by dates on the 3 open HPD violations have all passed. The latest was November 17, 2025. The report prints the date beside each one.

Is this your building?

2 open Class C and no facade report filed for inspection cycle 9. The oldest open HPD violation was filed June 14, 2023.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH/ECB summonses
6 DOB and FDNY summonses here since January 1, 2019, with $14,100 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 3 judgments docketed, the latest on July 31, 2025. A docketed judgment shows up in a title search.
  • August 13, 2026, FDNY: Recordkeeping. In violation.
  • April 8, 2025, DOB: Failure to submit required report of critical examination. Decided by default, $10,000 penalty imposed.
  • January 24, 2025, DOB: Failure to maintain building in code-compliant manner. Decided by default, $3,125 penalty imposed.

The newest 3 of 6 summonses OATH lists here. The report lists all 6, with each outcome, the penalty imposed and any docketing date. What the report adds

How a default is vacated

DOF tax lien sale
Listed for DOF's 2025 tax lien sale, for water and sewer charges only. The last list it appeared on was the 10-day notice of May 2025.
DOB violations
3 active DOB violations. The newest was issued February 22, 2024.
Housing court
2 housing court cases here since 2023, most of them tenant actions.
DOB facade
No Report Filed for inspection cycle 9. Reports in earlier inspection cycles rated it Unsafe in 2007, Safe in 2009, SWARMP in 2012, and Safe in 2017. SWARMP means safe with a repair and maintenance program. Need this filed?
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
Inspected February 1, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed May 7, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair orders
5 completed HPD emergency repair orders since October 12, 2023, awarded for $9,362 in total. The most recent of the 5, a general construction order, was opened December 30, 2025.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C2 open most often Vermin / Infestation
Vermin / InfestationDefect letter sent17146449
Vermin / InfestationDefect letter sent16852923
Class B1 open
No access to reinspect (first try)18258732
OATH/ECB2 open
Local Law, Class 2Decided by default37034738M
Construction, Class 2Decided by default39136386H

The full report on 909 Sheridan Ave, Bronx

Get the report on 909 Sheridan Ave, Bronx, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 909 Sheridan Avenue, Bronx have open violations?

Yes. 909 Sheridan Avenue, Bronx had 5 open violations on October 10, 2026: 3 from HPD and 2 from OATH/ECB. 2 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 3 years, since June 14, 2023.

Is 909 Sheridan Avenue, Bronx getting better or worse?

Open violations are sitting, with little movement either way. 2 open Class C, with nothing filed or new in the last 180 days. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 909 Sheridan Avenue, Bronx?

Since October 12, 2023, certifications were filed on 2 Class C violations, all 2 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 909 Sheridan Avenue, Bronx have active DOB violations?

Yes. 3 active DOB violations. The newest was issued February 22, 2024. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has 909 Sheridan Avenue, Bronx been in housing court?

Yes. 2 housing court cases here since 2023, most of them tenant actions. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Are any HPD emergency repair orders at 909 Sheridan Avenue, Bronx marked completed?

Yes. 5 completed HPD emergency repair orders since October 12, 2023, awarded for $9,362 in total. The most recent of the 5, a general construction order, was opened December 30, 2025. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade report find at 909 Sheridan Avenue, Bronx?

No Report Filed for inspection cycle 9. Reports in earlier inspection cycles rated it Unsafe in 2007, Safe in 2009, SWARMP in 2012, and Safe in 2017. SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

When was the boiler at 909 Sheridan Avenue, Bronx last inspected?

On February 1, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 909 Sheridan Avenue, Bronx last file its bedbug report?

On May 7, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 909 Sheridan Avenue, Bronx covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 909 Sheridan Avenue, Bronx rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 909 Sheridan Avenue, Bronx built?

The city's record gives 1938 as the year 909 Sheridan Avenue, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 7 floors.

How many apartments does 909 Sheridan Avenue, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 62 residential units at 909 Sheridan Avenue, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOF's tax lien sale lists, DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOF's tax lien sale lists, DOB violations, HPD's housing court cases, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 909 Sheridan Ave, Bronx: 62 units, 2 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/909-sheridan-avenue-bronx

How we count: /method.

Is this your building?