100 Thayer St, Manhattan
- Built
- 1930
- Floors
- 6
- Residential units
- 56
- Building type
- Elevator building
- Zoning district
- R7-2
- Lot area
- 12,850 sq ft
- Floor area
- 57,631 sq ft
En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 39 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 12 de septiembre de 2023.
Open now, most hazardous first
- 10Get these certified
Class C, immediately hazardous. Most often Vermin / Infestation.
- 28See the 28
Class B, hazardous. Most often Lead Paint.
- 1See it
OATH/ECB summons still active
Certifications are being filed faster than new violations come in. 22 certifications filed against 8 new Class C in the last 180 days.
Since October 12, 2023, certifications were filed on 20 Class C violations, all 20 by the original certify-by date. How certification works
The original certify-by dates on the 38 open HPD violations run from February 26, 2024 to November 26, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 9 on September 24, 2026 and 10 on October 8.
- OATH hearings
- A hearing on a DOB summons is set for November 12, 2026.
- OATH/ECB summonses
- 9 DOB and FDNY summonses here since January 1, 2019, with $14,025 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 4 judgments docketed, the latest on April 30, 2024. A docketed judgment shows up in a title search.
- September 2, 2026, DOB: Failure to maintain elevator or conveying system. $1,250 penalty imposed.
- December 11, 2023, DOB: Failure to maintain elevator or conveying system. In violation, $1,250 penalty imposed.
- November 20, 2023, DOB: Pedestrian protection does not meet code specifications. In violation, $2,400 penalty imposed.
The newest 3 of 9 summonses OATH lists here. The report lists all 9, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 12 active DOB violations. The newest was issued June 23, 2024.
- Housing court
- 6 housing court cases here since 2007, most of them tenant actions.
- DOB complaints
- 1 DOB complaint in the 12 months to September 25, 2026. It was filed August 27, 2026.
- DOB permits
- DOB NOW lists 2 work permits here, the newest issued December 18, 2023, for General Construction work.
- General Construction, issued December 18, 2023, expired April 13, 2024.
- Sidewalk Shed, issued September 22, 2023, signed off.
- Energy benchmarking
- ENERGY STAR score 18 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected February 26, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 2, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 10 open most often Vermin / Infestation | |||
| Fire Safety | Notice sent | 19287726 | ||
| Vermin / Infestation | Notice sent to tenant | 19240756 | ||
| Vermin / Infestation | Notice sent to tenant | 19240755 | ||
| CIV14 mailed | 19240749 | |||
| Vermin / Infestation | No access to reinspect (first try) | 19151896 | ALP REALTY LLC | |
| Notice sent | 19151885 | ALP REALTY LLC | ||
| Vermin / Infestation | No access to reinspect (first try) | 19151880 | ALP REALTY LLC | |
| Vermin / Infestation | To be reinspected | 19144598 | ALP REALTY LLC | |
| Lead Paint | Notice sent | 18536700 | ALP REALTY LLC | |
| Lead Paint | Notice sent | 18536699 | ALP REALTY LLC | |
| Class B | 28 open most often Lead Paint | |||
| Notice sent | 19287722 | |||
| Certified on time | 19240757 | |||
| CIV14 mailed | 19240753 | |||
| CIV14 mailed | 19240752 | |||
| Notice sent | 19166126 | ALP REALTY LLC | ||
| Notice sent | 19166125 | ALP REALTY LLC | ||
| Notice sent | 19166123 | ALP REALTY LLC | ||
| Mold | Defect letter sent | 19146020 | ALP REALTY LLC | |
| CIV14 mailed | 19151868 | ALP REALTY LLC | ||
| CIV14 mailed | 19151867 | ALP REALTY LLC | ||
| The report lists all 28, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 1 open | |||
| Elevators, Class 1 | Hearing pending | 39202750H | ||
The full report on 100 Thayer St, Manhattan
- All 39 open violations, each with the city's own words and the date on its notice.
- What each of the 10 city statuses here means, and how many of these carry it.
- How it compares with the 2,038 Manhattan buildings with 50 to 99 apartments.
- All 2 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 9 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 100 Thayer St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.