45 Carmine St
Manhattan, NY 10014
45 Carmine Street is an elevator building with 34 apartments, built in 1887. It has 1 open violation. The oldest open HPD violation was filed on September 30, 1999.
En español: 1 violación abierta. La más antigua del HPD lleva 27 años abierta, desde el 30 de septiembre de 1999.
Open now
Since November 27, 2023, a certification was filed on 1 Class C violation, by the original certify-by date. How certification works
The original certify-by date on the open HPD violation, March 7, 2025, has passed.
- Zoning district
- R6
- Lot area
- 3,750 sq ft
- Floor area
- 15,575 sq ft
- Tax lot (BBL)
- 1-00586-0040
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class B | 1 open | ||
| Notice sent | 17622648 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2025, HPD filed 68 violations and closed 109, all classes.
Year Filed Closed 2025 3 1 2024 0 1 2023 4 1 2022 11 96 2021 8 1 2020 2 2 2019 1 1 2018 7 0 2017 32 6 - Bedbug report
- Filed December 5, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH/ECB summonses
- 1 DOB summons here since January 1, 2019, with $1,562 in penalties imposed. 1 judgment docketed, on June 30, 2021. A docketed judgment shows up in a title search.
- September 14, 2020, DOB: Failure to maintain building in code-compliant manner. Decided by default, $1,562 penalty imposed.
DOB records
- DOB violations
- 4 active DOB violations. The newest was issued September 6, 2019.
- DOB complaints
- 1 DOB complaint in the last 12 months. It was filed November 20, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 40 DOB complaints from 1991 through November 25, 2026. 27 DOB violations since 1989, 13 resolved and 10 dismissed in DOB's records.
- Boiler inspection
- Inspected June 10, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 1 open violation this page lists without it.
- What the one city status here means, and how many of these carry it.
- How it compares with the 6,540 Manhattan buildings with 20 to 49 apartments.
- All 1 DOB summons at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.