725 10th Ave
Manhattan, NY 10019
725 10th Avenue is a hotel, built in 1959. It has 24 open violations, 1 of them Class C, immediately hazardous. The oldest open HPD violation was filed on November 30, 2022.
En español: 1 violación de Clase C abierta (peligro inmediato) y 24 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 30 de noviembre de 2022.
Open now, most hazardous first
- 1Get it certified
Class C, immediately hazardous, filed in the last 3 years
- 2See the 2
Class B, hazardous, filed in the last 3 years
- 21See the 21
OATH/ECB summonses still active. Most often Construction.
Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.
The original certify-by dates on the 3 open HPD violations have all passed. The latest was May 11, 2026.
- Zoning district
- R8
- Lot area
- 47,697 sq ft
- Floor area
- 159,996 sq ft
- Tax lot (BBL)
- 1-01078-0023
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 1 open | ||
| Fire Safety | Notice sent | 18725718 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to trash room at north at public hall, 2nd story, section 'west' | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 2 open | ||
| Notice sent | 18725716 | ||
| Notice sent | 17887683 | ||
| OATH/ECB | 21 open most often Construction | ||
| Construction, Class 2 | Hearing pending | 39206975R | |
| Construction, Class 2 | Hearing pending | 39206974P | |
| Construction, Class 2 | Found in violation | 39169977K | |
| Construction, Class 2 | Found in violation | 39169976Z | |
| Construction, Class 1 | Found in violation | 39169185M | |
| Construction, Class 2 | Found in violation | 39169184K | |
| Construction, Class 2 | Found in violation | 39169183Z | |
| Construction, Class 2 | Found in violation | 39169181P | |
| Construction, Class 2 | Found in violation | 39159388N | |
| Class 1 | Found in violation | 39125552K | |
| Class 2 | Found in violation | 39125551Z | |
| Class 1 | Found in violation | 39125550R | |
| Class 2 | Found in violation | 39125549J | |
| Class 2 | Found in violation | 39125548H | |
| Construction, Class 2 | Found in violation | 39125531L | |
| Construction, Class 1 | Found in violation | 39125522J | |
| Construction, Class 1 | Found in violation | 39125521H | |
| Construction, Class 1 | Found in violation | 39125520X | |
| Elevators, Class 1 | Found in violation | 39125507L | |
| Elevators, Class 1 | Found in violation | 39125506J | |
| Local Law, Class 2 | Found in violation | 37027875N | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 28 violations and closed 20, all classes.
Year Filed Closed 2026 4 5 2025 5 3 2024 4 5 2023 9 5 2022 3 1 2021 2 0 2018 0 1 2017 1 0 - Energy benchmarking
- ENERGY STAR score 51 for 2025, against a median of 51 for Hotel that year.
- Local Law 97
- Covered since 2024 (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed November 3, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Hearings and penalties
- OATH hearings
- 2 hearings scheduled on DOB summonses, the first on December 10, 2026.
- OATH/ECB summonses
- 75 DOB and FDNY summonses here since January 1, 2019, with $117,960 in penalties imposed. 21 of them are still active, the same 21 listed under OATH/ECB. 35 judgments docketed, the latest on November 9, 2026. A docketed judgment shows up in a title search.
- October 13, 2026, FDNY: Certificates of fitness and certificates of qualification.
- October 6, 2026, DOB: Failure to maintain building in code-compliant manner. $3,125 penalty imposed.
- October 6, 2026, DOB: Failure to maintain building in code-compliant manner. $1,250 penalty imposed.
The newest 3 of 75 summonses OATH lists here.
DOB records
- DOB violations
- 14 active DOB violations. The newest was issued December 11, 2024.
- DOB complaints
- 5 DOB complaints in the last 12 months. The newest was filed October 6, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 65 DOB complaints through November 25, 2026. 85 DOB violations since 1989, 34 resolved and 37 dismissed in DOB's records.
- DOB facade
- Rated Safe in the latest facade report, filed August 30, 2024 (inspection cycle 9). Reports in earlier inspection cycles rated it Unsafe in 2007, Safe in 2012, and Safe with a repair and maintenance program (SWARMP) in 2013 and 2019.
- DOB permits
- DOB NOW lists 3 work permits here, the newest issued May 31, 2024, for Structural work.
- Structural, issued May 31, 2024, signed off.
- Sidewalk Shed, issued February 21, 2024, signed off.
- Sidewalk Shed, issued October 13, 2020, signed off.
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on February 3.
The building report
- The city's wording on the 23 other open violations this page lists without it.
- What each of the 3 city statuses here means, and how many of these carry it.
- All 3 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 75 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 21 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.