Skip to content
ViolationScout6 open Class C, with 6 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.Your building
Buildings350 East 52 Street, ManhattanCurrent through

350 East 52nd St, Manhattan

BBL 1-01344-0030

Built
1962
Floors
15
Residential units
137
Building type
Elevator building
Zoning district
R10
Lot area
12,763 sq ft
Floor area
142,767 sq ft

En español: 6 violaciones de Clase C abiertas (peligro inmediato) y 19 abiertas en total. La más antigua del HPD lleva 7 años abierta, desde el 2 de julio de 2019.

Open now, most hazardous first

  1. 6

    Class C, immediately hazardous. Most often Fire Safety.

    11 open counting every year, the oldest since

    Get these certified
  2. 13

    Class B, hazardous. Most often Fire Safety.

    See the 13

Open violations are sitting, with little movement either way. 6 open Class C, with 6 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.

Since October 12, 2023, certifications were filed on 2 Class C violations: 1 by the original certify-by date, 1 after it. How certification works

The original certify-by dates on the 19 open HPD violations have all passed. The latest was October 27, 2025. The report prints the date beside each one.

Is this your building?

6 open Class C and a facade rated SWARMP. The oldest open HPD violation was filed July 2, 2019.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH/ECB summonses
22 DOB and FDNY summonses here since January 1, 2019, with $26,800 in penalties imposed. 6 judgments docketed, the latest on June 30, 2023. A docketed judgment shows up in a title search.
  • July 27, 2026, FDNY: General maintenance. In violation, $750 penalty imposed.
  • March 25, 2026, FDNY: Fire protection systems.
  • March 20, 2026, FDNY: Fire-rated construction. In violation.

The newest 3 of 22 summonses OATH lists here. The report lists all 22, with each outcome, the penalty imposed and any docketing date. What the report adds

DOB violations
2 active DOB violations, most of them for facade reports not filed or filed late. The newest was issued February 22, 2022.
Housing court
4 housing court cases here since 2016, most of them tenant actions.
DOB complaints
3 DOB complaints in the 12 months to September 25, 2026. The newest was filed June 15, 2026.
DOB facade
Rated SWARMP in the latest facade report, filed February 29, 2024 (inspection cycle 9). Reports in earlier inspection cycles rated it SWARMP in 2007, Unsafe in 2013, and Safe in 2014. SWARMP means safe with a repair and maintenance program. Need this filed?
DOB permits
3 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued July 30, 2026.
  • Sidewalk Shed, issued July 30, 2026, in effect until October 28, 2026.
  • General Construction, issued June 26, 2026, in effect until October 23, 2026.
  • Suspended Scaffold, issued June 1, 2026, in effect until October 23, 2026.

The newest 3 of 12 permits DOB NOW lists here. The report lists all 12, with job numbers and each job's estimated cost. What the report adds

Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
Inspected March 6, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed January 12, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair orders
6 completed HPD emergency repair orders since October 12, 2023, awarded for $6,135 in total. The most recent of the 6, a general construction order, was opened July 1, 2026.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C6 open most often Fire Safety
Fire SafetyTo be reinspected17865906
Fire SafetyNo access to reinspect (first try)17865768
Fire SafetyNo access to reinspect (first try)17865012
Fire SafetyNo access to reinspect (first try)17864890
Vermin / InfestationDefect letter sent17653068
MoldDefect letter sent16737681
Class B13 open most often Fire Safety
Not complied with18203324
Not complied with17858144
Not complied with17858089
No access to reinspect (first try)17495900
No access to reinspect (first try)17495899
Not complied with17314933
No access to reinspect (first try)17185795
Fire SafetyNo access to reinspect (first try)17185794
Fire SafetyNo access to reinspect (first try)17185793
Not complied with16881650
The report lists all 13, each with the city's own words and the date on its notice. What the report adds

The full report on 350 East 52nd St, Manhattan

Get the report on 350 East 52nd St, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 350 East 52 Street, Manhattan have open violations?

Yes. 350 East 52 Street, Manhattan had 19 open violations on October 10, 2026: 19 from HPD. 6 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 7 years, since July 2, 2019.

Is 350 East 52 Street, Manhattan getting better or worse?

Open violations are sitting, with little movement either way. 6 open Class C, with 6 certifications filed and 0 new Class C in the last 180 days, too few to call a direction. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 350 East 52 Street, Manhattan?

Since October 12, 2023, certifications were filed on 2 Class C violations: 1 by the original certify-by date, 1 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 350 East 52 Street, Manhattan have active DOB violations?

Yes. 2 active DOB violations, most of them for facade reports not filed or filed late. The newest was issued February 22, 2022. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has 350 East 52 Street, Manhattan been in housing court?

Yes. 4 housing court cases here since 2016, most of them tenant actions. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 350 East 52 Street, Manhattan?

Yes. 3 DOB complaints in the 12 months to September 25, 2026. The newest was filed June 15, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 350 East 52 Street, Manhattan marked completed?

Yes. 6 completed HPD emergency repair orders since October 12, 2023, awarded for $6,135 in total. The most recent of the 6, a general construction order, was opened July 1, 2026. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade report find at 350 East 52 Street, Manhattan?

Rated SWARMP in the latest facade report, filed February 29, 2024 (inspection cycle 9). Reports in earlier inspection cycles rated it SWARMP in 2007, Unsafe in 2013, and Safe in 2014. SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 350 East 52 Street, Manhattan?

Yes. 3 DOB work permits in effect. The latest, for Sidewalk Shed work, was issued July 30, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

When was the boiler at 350 East 52 Street, Manhattan last inspected?

On March 6, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 350 East 52 Street, Manhattan last file its bedbug report?

On January 12, 2026, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 350 East 52 Street, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 350 East 52 Street, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 350 East 52 Street, Manhattan built?

The city's record gives 1962 as the year 350 East 52 Street, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 15 floors.

How many apartments does 350 East 52 Street, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 137 residential units at 350 East 52 Street, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 350 East 52nd St, Manhattan: 137 units, 6 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/350-east-52-street-manhattan

How we count: /method.

Is this your building?