870 5th Ave
Manhattan, NY 10065
870 5th Avenue is an elevator building with 94 apartments, built in 1949. It has 44 open violations, 4 of them Class C, immediately hazardous. The oldest open HPD violation was filed on March 31, 2000.
En español: 4 violaciones de Clase C abiertas (peligro inmediato) y 44 abiertas en total. La más antigua del HPD lleva 26 años abierta, desde el 31 de marzo de 2000.
Open now, most hazardous first
- 4Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Vermin / Infestation.
- 35See the 35
Class B, hazardous, filed in the last 3 years. Most often Fire Safety.
- 5See the 5
OATH/ECB summonses still active. Most often Construction.
0.4 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.
The original certify-by dates on the 39 open HPD violations have all passed. The latest was August 26, 2024.
- Zoning district
- R10
- Lot area
- 17,750 sq ft
- Floor area
- 235,448 sq ft
- Tax lot (BBL)
- 1-01383-0001
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 4 open most often Vermin / Infestation | ||
| Notice sent | 17105790 | ||
| § 27-2070 ADM CODE Provide an adequate supply of gas to the fixtures at gas range in the kitchen | |||
| Notice sent | 17105775 | ||
| § 27-2005, 2006, 2037 HMC: Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires on all walls throughout in the 4th room from north at west | |||
| Vermin / Infestation | Notice sent to tenant | 16822156 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | |||
| Vermin / Infestation | Notice sent to tenant | 16610935 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of mice in the entire apartment | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 35 open most often Fire Safety | ||
| Notice sent | 17105789 | ||
| Notice sent | 17105787 | ||
| Notice sent | 17105779 | ||
| Notice sent | 17105778 | ||
| Notice sent | 17105769 | ||
| Notice sent | 17012279 | ||
| Notice sent | 17012276 | ||
| Notice sent | 17012275 | ||
| Notice sent | 16822158 | ||
| Notice sent | 16822157 | ||
| Notice sent | 16822155 | ||
| Notice sent | 16822153 | ||
| Notice sent | 16822152 | ||
| Notice sent | 16822151 | ||
| Notice sent | 16822150 | ||
| Notice sent | 16822149 | ||
| Notice sent | 16822147 | ||
| Notice sent | 16610939 | ||
| Notice sent | 16610938 | ||
| Fire Safety | Notice sent | 16610937 | |
| Fire Safety | Notice sent | 16610936 | |
| Notice sent | 16610934 | ||
| Notice sent | 16610933 | ||
| Notice sent | 16610932 | ||
| Notice sent | 16610931 | ||
| Notice sent | 16610930 | ||
| Notice sent | 16610929 | ||
| Notice sent | 16610926 | ||
| Notice sent | 16610916 | ||
| Notice sent | 16610913 | ||
| Notice sent | 16610912 | ||
| Notice sent | 16610911 | ||
| Notice sent | 16610910 | ||
| Notice sent | 16518849 | ||
| Notice sent | 16518848 | ||
| OATH/ECB | 5 open most often Construction | ||
| Construction, Class 2 | Hearing pending | 39181609Z | |
| Construction, Class 2 | Found in violation | 39138321X | |
| Construction, Class 2 | Found in violation | 37032703N | |
| Class 2 | Decided by default | 39111551L | |
| Construction, Class 2 | Found in violation | 39107500J | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2021 to 2026, HPD filed 178 violations and closed 18, all classes.
Year Filed Closed 2026 1 1 2025 3 0 2024 50 1 2023 36 1 2022 72 13 2021 16 2 - Energy benchmarking
- ENERGY STAR score 90 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered since 2024 (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed May 4, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Hearings and penalties
- OATH hearings
- A hearing on a DOB summons is set for February 8, 2027.
- OATH/ECB summonses
- 37 DOB and FDNY summonses here since January 1, 2019, with $46,074 in penalties imposed. 5 of them are still active, the same 5 listed under OATH/ECB. 18 judgments docketed, the latest on September 30, 2025. A docketed judgment shows up in a title search.
- March 24, 2026, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. Adjourned, $1,250 penalty imposed.
- April 4, 2025, DOB: Failure to maintain building walls or appurtenances. In violation, $1,250 penalty imposed.
- February 12, 2025, DOB: Fail to comply with commissioner order to file certificate of correction with DOB. In violation, $1,250 penalty imposed.
The newest 3 of 37 summonses OATH lists here.
- Housing court
- 1 housing court case here, opened in 2005. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 2 active DOB violations. The newest was issued September 16, 2025.
- DOB complaints
- 2 DOB complaints in the last 12 months. The newest was filed May 19, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 70 DOB complaints from 2000 through November 25, 2026. 70 DOB violations since 1993, 48 resolved and 20 dismissed in DOB's records.
- DOB facade
- Rated Safe in the latest facade report, filed March 28, 2025 (inspection cycle 9). An earlier report in this cycle, filed February 21, 2024, rated it Unsafe. Reports in earlier inspection cycles rated it Safe with a repair and maintenance program (SWARMP) in 2006, Safe in 2012, and SWARMP in 2019.
- DOB permits
- 9 DOB work permits in effect. The latest, for Plumbing work, was issued October 5, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- Plumbing, issued October 5, 2026, in effect until December 29, 2026.
- Plumbing, issued September 11, 2026, in effect until April 5, 2027.
- General Construction, issued August 31, 2026, expired November 4, 2026.
The newest 3 of 60 permits DOB NOW lists here.
The building report
- The city's wording on the 40 other open violations this page lists without it.
- What each of the 5 city statuses here means, and how many of these carry it.
- How it compares with the 2,042 Manhattan buildings with 50 to 99 apartments.
- All 60 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 37 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 5 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.