225 East 63rd St, Manhattan
- Built
- 1962
- Floors
- 14
- Residential units
- 151
- Building type
- Elevator building
- Zoning district
- R8B
- Lot area
- 12,552 sq ft
- Floor area
- 105,282 sq ft
En español: 17 violaciones de Clase C abiertas (peligro inmediato) y 26 abiertas en total. La más antigua del HPD lleva 18 meses abierta, desde el 14 de marzo de 2025.
Open now, most hazardous first
- 17Get these certified
Class C, immediately hazardous. Most often Vermin / Infestation.
- 8See the 8
Class B, hazardous
- 1See it
OATH/ECB summons still active
Open violations are sitting, with little movement either way. 17 open Class C, with 0 certifications filed and 4 new Class C in the last 180 days, too few to call a direction.
Since October 12, 2023, certifications were filed on 5 Class C violations: 2 by the original certify-by date, 3 after it. How certification works
The original certify-by dates on the 25 open HPD violations have all passed. The latest was June 26, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 17 on September 24, 2026 and 17 on October 8.
- OATH hearings
- A hearing on a DOB summons is set for January 6, 2027.
- OATH/ECB summonses
- 11 DOB and FDNY summonses here since January 1, 2019, with $9,585 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB.
- September 13, 2025, DOB: Work without a permit. Adjourned, $2,500 penalty imposed.
- August 7, 2023, DOB: Fail maintain building in compliant manner: Service equipment - boiler. In violation.
- March 22, 2023, DOB: Failure to maintain elevator or conveying system. Decided by default, $1,280 penalty imposed.
The newest 3 of 11 summonses OATH lists here. The report lists all 11, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 1 active DOB violation, issued August 8, 2002.
- DOB complaints
- 5 DOB complaints, 1 of them conversion complaint, in the 12 months to September 25, 2026. The newest was filed April 27, 2026.
- DOB facade
- Rated SWARMP in the latest facade report, filed July 10, 2023 (inspection cycle 9). Reports in earlier inspection cycles rated it Safe in 2008, 2012 and 2019. SWARMP means safe with a repair and maintenance program. Need this filed?
- DOB permits
- DOB NOW lists 7 work permits here, the newest issued April 21, 2020, for Sidewalk Shed work.
- Sidewalk Shed, issued April 21, 2020, signed off.
- Construction Fence, issued April 15, 2020, expired April 15, 2021.
- Structural, issued March 30, 2020, expired March 30, 2021.
The newest 3 of 7 permits DOB NOW lists here. The report lists all 7, with job numbers and each job's estimated cost. What the report adds
- Certificate of occupancy
- Final, issued January 26, 2017.
- Energy benchmarking
- ENERGY STAR score 87 for 2024, against a median of 67 for Multifamily Housing that year.
- Local Law 97
- Covered from 2026 as a rent-regulated building (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected June 1, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed December 1, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair order
- 1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened May 21, 2026, awarded for $960.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 17 open most often Vermin / Infestation | |||
| Vermin / Infestation | Notice sent to tenant | 18952708 | AYA BSD Renoir LLC | |
| Fire Safety | Notice sent | 18808566 | AYA BSD Renoir LLC | |
| Vermin / Infestation | Notice sent to tenant | 18808565 | AYA BSD Renoir LLC | |
| Vermin / Infestation | Notice sent to tenant | 18808564 | AYA BSD Renoir LLC | |
| Vermin / Infestation | Notice sent to tenant | 18775711 | AYA BSD Renoir LLC | |
| Vermin / Infestation | Notice sent to tenant | 18775710 | AYA BSD Renoir LLC | |
| Fire Safety | Notice sent | 18712724 | AYA BSD Renoir LLC | |
| Vermin / Infestation | Notice sent to tenant | 18712723 | AYA BSD Renoir LLC | |
| Vermin / Infestation | Notice sent to tenant | 18712722 | AYA BSD Renoir LLC | |
| Vermin / Infestation | Notice sent | 18680366 | AYA BSD Renoir LLC | |
| The report lists all 17, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 8 open | |||
| Notice sent | 18686007 | AYA BSD Renoir LLC | ||
| Notice sent | 18680364 | AYA BSD Renoir LLC | ||
| Notice sent | 18154260 | |||
| Notice sent | 18154259 | |||
| Certified late | 18074707 | |||
| Notice sent | 17766038 | |||
| Invalid certification | 17766036 | |||
| Invalid certification | 17757696 | |||
| OATH/ECB | 1 open | |||
| Construction, Class 1 | Hearing pending | 39160331K | ||
The full report on 225 East 63rd St, Manhattan
- All 26 open violations, each with the city's own words and the date on its notice.
- What each of the 5 city statuses here means, and how many of these carry it.
- How it compares with the 1,033 Manhattan buildings with 100 to 199 apartments.
- All 7 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 11 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing date on the 1 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 225 East 63rd St, Manhattan, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.