58 East 80th St
Manhattan, NY 10075
58 East 80th Street is an elevator building with 10 apartments, built in 1925. It has 5 open violations. The oldest open HPD violation was filed on January 25, 1997.
En español: 5 violaciones abiertas, ninguna de Clase C. La más antigua del HPD lleva 29 años abierta, desde el 25 de enero de 1997.
Open now
The original certify-by date on the 5 open HPD violations, September 8, 2026, has passed.
- Zoning district
- R8B
- Lot area
- 1,840 sq ft
- Floor area
- 5,289 sq ft
- Tax lot (BBL)
- 1-01491-0144
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class B | 5 open most often Fire Safety | ||
| Fire Safety | Postponement denied | 19084688 | |
| Fire Safety | Postponement denied | 19084687 | |
| Postponement denied | 19084685 | ||
| Postponement denied | 19084684 | ||
| Postponement denied | 19084683 | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 8 violations and closed 2, all classes.
Year Filed Closed 2026 7 0 2019 0 2 2017 1 0 - Bedbug report
- Filed December 10, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH/ECB summonses
- 2 FDNY summonses here since January 1, 2019, with $1,550 in penalties imposed.
- May 16, 2024, FDNY: Rooftop access and means of egress. In violation, $950 penalty imposed.
- October 4, 2023, FDNY: Inspection and testing. In violation, $600 penalty imposed.
- Housing court
- 2 housing court cases here since 2016, most of them tenant actions. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 7 active DOB violations. The newest was issued May 30, 2014.
- DOB, all years
- 16 DOB complaints from 1991 through November 25, 2026. 21 DOB violations since 1991, 10 resolved and 4 dismissed in DOB's records.
- Boiler inspection
- 2 boilers, both inspected in 2026, the latest on May 13. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 5 open violations this page lists without it.
- What the one city status here means, and how many of these carry it.
- How it compares with the 11,097 Manhattan buildings with 6 to 19 apartments.
- All 2 FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.