Skip to content
ViolationScout2 open Class C, with 1 certification filed and 0 new Class C in the last 180 days, too few to call a direction.Your building
Buildings303 West 154 Street, ManhattanCurrent through

303 West 154th St, Manhattan

BBL 1-02047-0025

Built
1929
Floors
6
Residential units
54
Building type
Elevator building
Zoning district
R8
Lot area
9,992 sq ft
Floor area
37,842 sq ft
Last sale
$26,157,610 for 3 lots

En español: 2 violaciones de Clase C abiertas (peligro inmediato) y 6 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 12 de septiembre de 2023.

Open now, most hazardous first

  1. 2

    Class C, immediately hazardous. Most often Lead Paint.

    3 open counting every year, the oldest since

    Get these certified
  2. 2

    Class B, hazardous

    See the 2
  3. 2

    OATH/ECB summonses still active. Most often Elevators.

    See the 2

Open violations are sitting, with little movement either way. 2 open Class C, with 1 certification filed and 0 new Class C in the last 180 days, too few to call a direction.

Since October 12, 2023, certifications were filed on 21 Class C violations, all 21 by the original certify-by date. How certification works

The original certify-by dates on the 4 open HPD violations run from February 20, 2025 to October 12, 2026. The report prints the date beside each one.

Is this your building?

2 open Class C. The oldest open HPD violation was filed September 12, 2023.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH/ECB summonses
27 DOB and FDNY summonses here since January 1, 2019, with $113,250 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 17 judgments docketed, the latest on February 28, 2025. A docketed judgment shows up in a title search.
  • June 6, 2024, DOB: Failure to maintain elevator or conveying system. In violation, $625 penalty imposed.
  • March 12, 2024, DOB: Failure to maintain elevator or conveying system. In violation, $625 penalty imposed.
  • March 30, 2023, DOB: Failure to maintain elevator or conveying system. In violation, $1,250 penalty imposed.

The newest 3 of 27 summonses OATH lists here. The report lists all 27, with each outcome, the penalty imposed and any docketing date. What the report adds

DOB violations
4 active DOB violations. The newest was issued February 21, 2024.
Housing court
19 housing court cases here since 2004, most of them tenant actions.
DOB complaints
2 DOB complaints, 1 of them conversion complaint, in the 12 months to September 25, 2026. The newest was filed November 27, 2025.
DOB facade
Rated Safe in the latest facade report, filed March 13, 2025 (inspection cycle 9). An earlier report in this cycle, filed February 21, 2024, rated it Unsafe. Reports in earlier inspection cycles rated it Safe in 2012 and 2016.
DOB permits
DOB NOW lists 1 work permit here: General Construction, issued February 25, 2022, signed off.
Energy benchmarking
ENERGY STAR score 57 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
Inspected July 31, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 8, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
Tax exemption
Has an Article XI tax exemption (DOF 2026/27 roll).
HPD emergency repair orders
2 completed HPD emergency repair orders since October 12, 2023, awarded for $944 in total. The most recent of the 2, a general construction order, was opened August 28, 2024.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C2 open most often Lead Paint
Lead PaintDefect letter sent17641508
Lead PaintDefect letter sent17641507
Class B2 open
Notice sent19156141J Robinson Park LLC
Notice sent19156140J Robinson Park LLC
OATH/ECB2 open most often Elevators
Elevators, Class 2Found in violation39116126N
Elevators, Class 2Found in violation39108397P

The full report on 303 West 154th St, Manhattan

Get the report on 303 West 154th St, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 303 West 154 Street, Manhattan have open violations?

Yes. 303 West 154 Street, Manhattan had 6 open violations on October 10, 2026: 4 from HPD and 2 from OATH/ECB. 2 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 3 years, since September 12, 2023.

Is 303 West 154 Street, Manhattan getting better or worse?

Open violations are sitting, with little movement either way. 2 open Class C, with 1 certification filed and 0 new Class C in the last 180 days, too few to call a direction. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 303 West 154 Street, Manhattan?

Since October 12, 2023, certifications were filed on 21 Class C violations, all 21 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 303 West 154 Street, Manhattan have active DOB violations?

Yes. 4 active DOB violations. The newest was issued February 21, 2024. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has 303 West 154 Street, Manhattan been in housing court?

Yes. 19 housing court cases here since 2004, most of them tenant actions. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 303 West 154 Street, Manhattan?

Yes. 2 DOB complaints, 1 of them conversion complaint, in the 12 months to September 25, 2026. The newest was filed November 27, 2025. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

Are any HPD emergency repair orders at 303 West 154 Street, Manhattan marked completed?

Yes. 2 completed HPD emergency repair orders since October 12, 2023, awarded for $944 in total. The most recent of the 2, a general construction order, was opened August 28, 2024. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

What did the latest facade report find at 303 West 154 Street, Manhattan?

Rated Safe in the latest facade report, filed March 13, 2025 (inspection cycle 9). An earlier report in this cycle, filed February 21, 2024, rated it Unsafe. Reports in earlier inspection cycles rated it Safe in 2012 and 2016. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

What is the ENERGY STAR score for 303 West 154 Street, Manhattan?

ENERGY STAR score 57 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

When was the boiler at 303 West 154 Street, Manhattan last inspected?

On July 31, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 303 West 154 Street, Manhattan last file its bedbug report?

On December 8, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 303 West 154 Street, Manhattan covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 303 West 154 Street, Manhattan rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

Does 303 West 154 Street, Manhattan have a property tax exemption?

The building has an Article XI tax exemption on DOF's 2026/27 roll. An exemption lowers a property's tax bill by reducing its assessed value.

When was 303 West 154 Street, Manhattan built?

The city's record gives 1929 as the year 303 West 154 Street, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 6 floors.

How many apartments does 303 West 154 Street, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 54 residential units at 303 West 154 Street, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, HPD emergency repair orders, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list, the city's PLUTO tax-lot file and DOF's property sales records. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 303 West 154th St, Manhattan: 54 units, 2 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/303-west-154-street-manhattan

How we count: /method.

Is this your building?