123 Washington St
Manhattan, NY 10006
123 Washington Street is a condominium with 223 apartments, built in 2007. It has 16 open violations. The oldest open HPD violation was filed on February 18, 2026.
En español: 16 violaciones abiertas, ninguna de Clase C. La más antigua del HPD lleva 9 meses abierta, desde el 18 de febrero de 2026.
Open now, most hazardous first
- 2See the 2
Class B, hazardous, filed in the last 3 years
- 14See the 14
OATH/ECB summonses still active. Most often Elevators.
The original certify-by dates on the 2 open HPD violations have all passed. The latest was July 9, 2026.
- Zoning district
- C6-9
- Lot area
- 14,217 sq ft
- Floor area
- 312,633 sq ft
- Tax lot (BBL)
- 1-00053-7502
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class B | 2 open | ||
| Notice sent | 18943085 | ||
| Notice sent | 18653394 | ||
| OATH/ECB | 14 open most often Elevators | ||
| Elevators, Class 1 | Hearing pending | 39194400K | |
| Elevators, Class 1 | Found in violation | 39187205J | |
| Elevators, Class 1 | Hearing pending | 39181887Z | |
| Elevators, Class 1 | Decided by default | 39166446H | |
| Elevators, Class 1 | Decided by default | 39166445X | |
| Elevators, Class 1 | Decided by default | 39166444Y | |
| Elevators, Class 2 | Decided by default | 39147254J | |
| Elevators, Class 2 | Decided by default | 39147253H | |
| Elevators, Class 2 | Decided by default | 39147252X | |
| Elevators, Class 2 | Hearing pending | 39140330K | |
| Elevators, Class 2 | Hearing pending | 39140329N | |
| Elevators, Class 2 | Hearing pending | 39140328L | |
| Elevators, Class 2 | Hearing pending | 39140327J | |
| Elevators, Class 2 | Hearing pending | 39140326H | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2018 to 2026, HPD filed 16 violations and closed 6, all classes.
Year Filed Closed 2026 10 0 2023 1 1 2022 1 3 2021 2 0 2019 1 1 2018 1 1 - Energy benchmarking
- ENERGY STAR score 41 for 2025, against a median of 69 for Multifamily Housing that year.
- Local Law 97
- Covered since 2024 (DOB's list, March 1, 2026). Being on the list does not mean the building fails the law or owes a penalty.
- Bedbug report
- Filed December 9, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
Hearings and penalties
- OATH hearings
- 2 hearings scheduled on DOB summonses, the first on February 5, 2027.
- OATH/ECB summonses
- 66 DOB and FDNY summonses here since January 1, 2019, with $120,943 in penalties imposed. 14 of them are still active, the same 14 listed under OATH/ECB. 32 judgments docketed, the latest on October 31, 2026. A docketed judgment shows up in a title search.
- September 30, 2026, FDNY: General maintenance.
- September 30, 2026, FDNY: Inspection and testing.
- September 2, 2026, DOB: Failure to maintain elevator or conveying system. In violation, $1,250 penalty imposed.
The newest 3 of 66 summonses OATH lists here.
DOB records
- DOB violations
- 4 active DOB violations. The newest was issued February 22, 2024.
- DOB, all years
- 70 DOB violations since 2010, 44 resolved and 22 dismissed in DOB's records.
- DOB facade
- Rated Safe with a repair and maintenance program (SWARMP) in the latest facade report, filed August 21, 2024 (inspection cycle 9). Reports in earlier inspection cycles rated it Unsafe in 2019 and Safe in 2022.
- DOB permits
- 1 DOB work permit in effect, for General Construction work, issued July 21, 2026. A permit lets the work go ahead. It does not mean the work is done, or that it fixes a violation here.
- General Construction, issued July 21, 2026, in effect until February 19, 2027.
- Suspended Scaffold, issued January 11, 2024, signed off.
- Plumbing, issued November 24, 2020, signed off.
The newest 3 of 6 permits DOB NOW lists here.
- Certificate of occupancy
- DOB issued a final certificate of occupancy on June 6, 2016.
The building report
- The city's wording on the 16 open violations this page lists without it.
- What each of the 4 city statuses here means, and how many of these carry it.
- How it compares with the 799 Manhattan buildings with 200 or more apartments.
- All 6 DOB NOW work permits, with job numbers and each job's estimated cost.
- All 66 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 14 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.