Skip to content
ViolationScout13 open Class C, with nothing filed or new in the last 180 days.Your building
Buildings1407 Lincoln Place, BrooklynCurrent through

1407 Lincoln Pl

Crown Heights, Brooklyn, NY 11213

1407 Lincoln Place is a two-family house, built in 1920. It has 60 open violations, 13 of them Class C, immediately hazardous. The oldest open HPD violation was filed on November 26, 2014.

En español: 13 violaciones de Clase C abiertas (peligro inmediato) y 60 abiertas en total. La más antigua del HPD lleva 11 años abierta, desde el 26 de noviembre de 2014.

Open now, most hazardous first

  1. 13

    Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.

    15 open counting every year, the oldest since

    Get these certified
  2. 42

    Class B, hazardous, filed in the last 3 years. Most often Vermin / Infestation.

    See the 42
  3. 5

    OATH/ECB summonses still active. Most often Construction.

    See the 5

Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.

The original certify-by dates on the 55 open HPD violations have all passed. The latest was February 24, 2026.

Zoning district
R6
Lot area
3,006 sq ft
Floor area
2,280 sq ft
Last transfer
No price recorded
Tax lot (BBL)
3-01385-0072

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C13 open most often Lead Paint
Lead PaintNotice sent17002118
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) north wall in the 5th room from north at east
Lead PaintNotice sent17002117
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) south wall, west wall in the 4th room from north
Notice sent16980423
§ 27-2043.1 HMC Install the missing or repair/replace the defective window guard(S) in accordance with the specifications of the new york city health code section 24 RCNY chapter 12. Wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment
Lead PaintNotice sent16827462
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
Lead PaintNotice sent16826896
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from north at east wall in the 5th room from north at west
Lead PaintNotice sent16826895
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 2nd door from north at east wall, 1st door frame from north at east wall, wainscotting at south wall, wainscotting at east wall, wainscotting at west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 5th room from north at west
Lead PaintNotice sent16826894
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from north at east wall in the bathroom
Lead PaintNotice sent16826893
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door frame from east at south wall in the foyer
Lead PaintNotice sent16826892
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at south wall, baseboard at west wall, 1st door frame from east at south wall, 1st window frame from west at north wall in the 1st room from north at west
Lead PaintNotice sent16826891
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door frame from east at south wall in the 5th room from north at east
Lead PaintNotice sent16826890
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 2nd door frame from west at north wall, 1st door frame from east at south wall, wainscotting at north wall, wainscotting at south wall, wainscotting at east wall, wainscotting at west wall, 1st window frame from south at west wall, 2nd window frame from south at west wall, 3rd window frame from south at west wall in the 4th room from north
Lead PaintNotice sent16826889
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) baseboard at east wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north at east
Lead PaintNotice sent16826888
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall, 1st window frame from south at west wall in the kitchen
In HPD's words. Apartment numbers are left out.
Class B42 open most often Vermin / Infestation
Vermin / InfestationNotice sent18545880
Vermin / InfestationNotice sent18545879
Notice sent18545878
Notice sent18545877
MoldNo access to reinspect (first try)17176798
Notice sent17002072
Notice sent17002066
Notice sent17002065
Notice sent17002064
Vermin / InfestationNotice sent17002063
Notice sent17002057
Notice sent17002050
Notice sent17002021
Notice sent17002015
Notice sent17002006
Notice sent16980424
Fire SafetyNotice sent16980422
Notice sent16980420
Vermin / InfestationNotice sent16980418
Vermin / InfestationNotice sent16980417
Fire SafetyNotice sent16951936
Vermin / InfestationNotice sent16951935
Notice sent16826645
Notice sent16826634
Notice sent16826629
Notice sent16826598
Notice sent16826503
Notice sent16826484
Notice sent16826476
Notice sent16826473
Notice sent16794527
Notice sent16794526
Notice sent16794524
Heat / Hot WaterNotice sent16794523
Heat / Hot WaterNotice sent16794522
Notice sent16794521
Fire SafetyNotice sent16794520
Notice sent16794519
Notice sent16794517
Notice sent16794516
Vermin / InfestationNotice sent16794515
Notice sent16794514
OATH/ECB5 open most often Construction
Construction, Class 1Hearing pending39184399N1407 HOLDING CORP
Construction, Class 1Hearing pending39184398L1407 HOLDING CORP
Construction, Class 1Hearing pending39184397J1407 HOLDING CORP
Class 1Hearing pending39184396H1407 HOLDING CORP
Construction, Class 1Hearing pending39184395X1407 HOLDING CORP
Is this your building?Also for tenants and buyers
Is this your building?

5 OATH hearings starting February 4, 2027.

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
13 on September 24, 2026 and 13 on November 8.
HPD, by year
From 2023 to 2026, HPD filed 72 violations and closed 5, all classes.
YearFiledClosed
202664
2024620
202341

Hearings and penalties

OATH hearings
5 hearings scheduled on DOB summonses, the first on February 4, 2027.
OATH/ECB summonses
5 DOB summonses here since January 1, 2019, with $12,500 in penalties imposed. All 5 are still active, the same 5 listed under OATH/ECB.
  • April 13, 2026, DOB: Work without a permit. Adjourned, $2,500 penalty imposed.
  • April 13, 2026, DOB: Work without a permit. Adjourned, $2,500 penalty imposed.
  • April 13, 2026, DOB: Fail maintain building compliant manner: No fire stopping. Adjourned, $2,500 penalty imposed.

The newest 3 of 5 summonses OATH lists here.

DOB records

DOB complaints
1 DOB complaint in the last 12 months, a conversion complaint. It was filed March 8, 2026. A conversion complaint, like any complaint, is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
3 DOB complaints from 2004 through November 14, 2026.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is lead paint.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 1407 Lincoln Pl have open violations?

Yes. It had 60 open violations on November 14, 2026: 5 from OATH/ECB and 55 from HPD. 13 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 11 years, since November 26, 2014.

Is this building getting better or worse?

Open violations are sitting, with little movement either way. 13 open Class C, with nothing filed or new in the last 180 days. The 180 days run to November 14, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, HPD's building registrations, OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB complaints, the city's PLUTO tax-lot file and DOF's property sales records. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 1407 Lincoln Pl, Brooklyn: 2 units, 13 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 14, 2026. https://violationscout.com/building/1407-lincoln-place-brooklyn

How we count: /method.

Is this your building?