Skip to content
ViolationScout2 open Class C, with 6 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.Your building
Buildings158 Stanton Street, ManhattanCurrent through

158 Stanton St, Manhattan

BBL 1-00350-0035

Built
1920
Floors
5
Residential units
16
Building type
Walk-up building
Zoning district
R7A
Lot area
2,500 sq ft
Floor area
8,063 sq ft

En español: 2 violaciones de Clase C abiertas (peligro inmediato). La más antigua del HPD lleva 2 años abierta, desde el 23 de febrero de 2024.

Open now

  1. 2

    Class C, immediately hazardous. Most often Fire Safety.

    Oldest open since

    Get these certified

Open violations are sitting, with little movement either way. 2 open Class C, with 6 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.

Since October 12, 2023, certifications were filed on 4 Class C violations: 3 by the original certify-by date, 1 after it. How certification works

The original certify-by dates on the 2 open HPD violations have all passed. The latest was May 6, 2026. The report prints the date beside each one.

Is this your building?

2 open Class C. The oldest open HPD violation was filed February 23, 2024.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

Housing court
1 housing court case here, opened in 2017.
Boiler inspection
2 boilers, both inspected in 2025, the latest on October 2. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
Bedbug report
Filed December 5, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C2 open most often Fire Safety
Fire SafetyCertified late18799668158-60 STANTON ST, LLC
Fire SafetyNot complied with16701750

The full report on 158 Stanton St, Manhattan

Get the report on 158 Stanton St, Manhattan, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 158 Stanton Street, Manhattan have open violations?

Yes. 158 Stanton Street, Manhattan had 2 open violations on October 10, 2026: 2 from HPD. 2 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 2 years, since February 23, 2024.

Is 158 Stanton Street, Manhattan getting better or worse?

Open violations are sitting, with little movement either way. 2 open Class C, with 6 certifications filed and 1 new Class C in the last 180 days, too few to call a direction. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 158 Stanton Street, Manhattan?

Since October 12, 2023, certifications were filed on 4 Class C violations: 3 by the original certify-by date, 1 after it. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Has 158 Stanton Street, Manhattan been in housing court?

Yes. 1 housing court case here, opened in 2017. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

When was the boiler at 158 Stanton Street, Manhattan last inspected?

It has 2 boilers, both inspected in 2025, the latest on October 2. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 158 Stanton Street, Manhattan last file its bedbug report?

On December 5, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

When was 158 Stanton Street, Manhattan built?

The city's record gives 1920 as the year 158 Stanton Street, Manhattan was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up building with 5 floors.

How many apartments does 158 Stanton Street, Manhattan have?

The Department of City Planning's PLUTO tax-lot file lists 16 residential units at 158 Stanton Street, Manhattan. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on HPD's housing court cases, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus HPD's housing court cases, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 158 Stanton St, Manhattan: 16 units, 2 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/158-stanton-street-manhattan

How we count: /method.

Is this your building?