Skip to content
ViolationScout4 open Class C, with nothing filed or new in the last 180 days.Your building
Buildings1820 Harrison Avenue, BronxCurrent through

1820 Harrison Ave, Bronx

BBL 2-02869-0009

Built
1962
Floors
6
Residential units
75
Building type
Elevator building
Zoning district
R7-1
Lot area
19,746 sq ft
Floor area
68,874 sq ft

En español: 4 violaciones de Clase C abiertas (peligro inmediato) y 6 abiertas en total. La más antigua del HPD lleva 41 años abierta, desde el 2 de mayo de 1985.

Open now, most hazardous first

  1. 4

    Class C, immediately hazardous. Most often Vermin / Infestation.

    Oldest open since

    Get these certified
  2. 2

    OATH/ECB summonses still active

    See the 2

Open violations are sitting, with little movement either way. 4 open Class C, with nothing filed or new in the last 180 days.

Since October 12, 2023, certifications were filed on 24 Class C violations, all 24 by the original certify-by date. How certification works

The original certify-by dates on the 4 open HPD violations have all passed. The latest was July 22, 2024. The report prints the date beside each one.

Is this your building?

4 open Class C and an OATH hearing on November 6, 2026. The oldest open HPD violation was filed May 2, 1985.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH hearings
A hearing on a DOB summons is set for November 6, 2026.
OATH/ECB summonses
2 DOB summonses here since January 1, 2019, with $1,875 in penalties imposed. All 2 are still active, the same 2 listed under OATH/ECB. 1 judgment docketed, on August 31, 2024. A docketed judgment shows up in a title search.
  • August 27, 2026, DOB: Failure to maintain elevator or conveying system. $625 penalty imposed.
  • January 16, 2024, DOB: Fail to file amendment acceptable report to correct unsafe conditions. In violation, $1,250 penalty imposed.
DOB violations
2 active DOB violations. The newest was issued September 18, 2024.
Housing court
1 housing court case here, opened in 2024.
DOB complaints
2 DOB complaints in the 12 months to September 25, 2026. The newest was filed July 20, 2026.
DOB facade
Rated Safe in the latest facade report, filed October 29, 2025 (inspection cycle 10). Reports in earlier inspection cycles rated it SWARMP in 2007 and 2014, Safe in 2018, Unsafe in 2022, and Safe in 2025. SWARMP means safe with a repair and maintenance program.
DOB permits
1 DOB work permit in effect, for Suspended Scaffold work, issued April 21, 2026.
  • Suspended Scaffold, issued April 21, 2026, in effect until April 21, 2027.
  • Sidewalk Shed, issued July 28, 2025, expired July 28, 2026.
  • General Construction, issued August 21, 2024, signed off.

The newest 3 of 5 permits DOB NOW lists here. The report lists all 5, with job numbers and each job's estimated cost. What the report adds

Energy benchmarking
ENERGY STAR score 55 for 2024, against a median of 67 for Multifamily Housing that year.
Local Law 97
Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
Boiler inspection
Inspected July 24, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
Bedbug report
Filed December 1, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
Tax exemption
Has a J-51 tax exemption (DOF 2026/27 roll). DOF lists its start year as 2001.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C4 open most often Vermin / Infestation
Vermin / InfestationNot complied with17060166
Vermin / InfestationNotice sent to tenant16567482
Vermin / InfestationNot complied with16335493
Vermin / InfestationNot complied with16335492
OATH/ECB2 open
Elevators, Class 2Hearing pending39202085R1820 HARRISON REALTY, L.L.C
Local Law, Class 2Found in violation37026579Y

The full report on 1820 Harrison Ave, Bronx

Get the report on 1820 Harrison Ave, Bronx, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is vermin and pests.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 1820 Harrison Avenue, Bronx have open violations?

Yes. 1820 Harrison Avenue, Bronx had 6 open violations on October 10, 2026: 2 from OATH/ECB and 4 from HPD. 4 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 41 years, since May 2, 1985.

Is 1820 Harrison Avenue, Bronx getting better or worse?

Open violations are sitting, with little movement either way. 4 open Class C, with nothing filed or new in the last 180 days. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 1820 Harrison Avenue, Bronx?

Since October 12, 2023, certifications were filed on 24 Class C violations, all 24 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 1820 Harrison Avenue, Bronx have an OATH hearing coming up?

Yes. A hearing on a DOB summons is set for November 6, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Does 1820 Harrison Avenue, Bronx have active DOB violations?

Yes. 2 active DOB violations. The newest was issued September 18, 2024. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Has 1820 Harrison Avenue, Bronx been in housing court?

Yes. 1 housing court case here, opened in 2024. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

Has DOB received complaints about 1820 Harrison Avenue, Bronx?

Yes. 2 DOB complaints in the 12 months to September 25, 2026. The newest was filed July 20, 2026. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade report find at 1820 Harrison Avenue, Bronx?

Rated Safe in the latest facade report, filed October 29, 2025 (inspection cycle 10). Reports in earlier inspection cycles rated it SWARMP in 2007 and 2014, Safe in 2018, Unsafe in 2022, and Safe in 2025. SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 1820 Harrison Avenue, Bronx?

Yes. 1 DOB work permit in effect, for Suspended Scaffold work, issued April 21, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

What is the ENERGY STAR score for 1820 Harrison Avenue, Bronx?

ENERGY STAR score 55 for 2024, against a median of 67 for Multifamily Housing that year. Buildings over 25,000 square feet report their energy use to the city every year under Local Law 84. The ENERGY STAR score runs from 1 to 100 and compares a building with similar ones nationwide; 50 is the national median. The score is the one the city publishes, and this page never estimates a Local Law 97 emissions penalty. A lot that reported several properties in one year is not scored here.

When was the boiler at 1820 Harrison Avenue, Bronx last inspected?

On July 24, 2025. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 1820 Harrison Avenue, Bronx last file its bedbug report?

On December 1, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 1820 Harrison Avenue, Bronx covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

Is 1820 Harrison Avenue, Bronx rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

Does 1820 Harrison Avenue, Bronx have a property tax exemption?

The building has a J-51 tax exemption on DOF's 2026/27 roll. DOF lists its start year as 2001. An exemption lowers a property's tax bill by reducing its assessed value.

When was 1820 Harrison Avenue, Bronx built?

The city's record gives 1962 as the year 1820 Harrison Avenue, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 6 floors.

How many apartments does 1820 Harrison Avenue, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 75 residential units at 1820 Harrison Avenue, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, OATH/ECB summonses from DOB and FDNY, DOB violations, HPD's housing court cases, DOB complaints, the Rent Guidelines Board's stabilized-building lists, DOF's exemption rolls, DOB facade filings, DOB NOW work permits, Local Law 84 energy reports, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 1820 Harrison Ave, Bronx: 75 units, 4 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/1820-harrison-avenue-bronx

How we count: /method.

Is this your building?