1858 Woodbine St
Ridgewood, Queens, NY 11385
1858 Woodbine Street is a walk-up building with 6 apartments, built in 1913. It has 13 open violations, 5 of them Class C, immediately hazardous. The oldest open HPD violation was filed on May 16, 2018.
En español: 5 violaciones de Clase C abiertas (peligro inmediato) y 13 abiertas en total. La más antigua del HPD lleva 8 años abierta, desde el 16 de mayo de 2018.
Open now, most hazardous first
- 5Get these certified
Class C, immediately hazardous, filed in the last 3 years
- 8See the 8
Class B, hazardous, filed in the last 3 years. Most often Fire Safety.
8.3 open Class C per 10 apartments. Across the city: 0.7.
Open violations are sitting, with little movement either way. No certification filed and no new Class C violation in the last 180 days.
Since November 27, 2023, a certification was filed on 1 Class C violation, by the original certify-by date. How certification works
The original certify-by dates on the 13 open HPD violations have all passed. The latest was September 30, 2024.
- Zoning district
- R6B
- Lot area
- 2,742 sq ft
- Floor area
- 5,600 sq ft
- Tax lot (BBL)
- 4-03470-0005
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 5 open | ||
| Fire Safety | Notice sent | 17178935 | |
| § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) (C) MDL and 28 RCNY §25-171: Replace or repair the self-closing doors that is missing or defective binding door and door frame in the entrance | |||
| Vermin / Infestation | Notice sent to tenant | 17178933 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| Lead Paint | Defect letter sent | 16930087 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from north at east wall in the 3rd room from north | |||
| Lead Paint | Defect letter sent | 16930085 | |
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) ceiling, west wall in the kitchen | |||
| Vermin / Infestation | Notice sent to tenant | 16919533 | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | |||
| In HPD's words. Apartment numbers are left out. | |||
| Class B | 8 open most often Fire Safety | ||
| Fire Safety | Notice sent | 17178937 | |
| Fire Safety | Notice sent | 17178936 | |
| Notice sent | 17178934 | ||
| Notice sent | 16919535 | ||
| Notice sent | 16919534 | ||
| Notice sent | 16919531 | ||
| Notice sent | 16919529 | ||
| Mold | Defect letter sent | 16919528 | |
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- HPD, by year
- From 2017 to 2026, HPD filed 65 violations and closed 36, all classes.
Year Filed Closed 2026 2 2 2025 2 1 2024 17 5 2023 2 1 2022 11 8 2021 1 1 2020 4 5 2019 9 1 2018 9 9 2017 8 3 - Bedbug report
- Filed June 3, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
Hearings and penalties
- OATH/ECB summonses
- 1 DOB summons here since January 1, 2019, with $1,562 in penalties imposed. 1 judgment docketed, on July 31, 2022. A docketed judgment shows up in a title search.
- February 10, 2022, DOB: Fail maintain building in compliant manner: Service equipment - boiler. Decided by default, $1,562 penalty imposed.
- Housing court
- 2 housing court cases here since 2012. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 7 active DOB violations. The newest was issued November 14, 2025.
- DOB, all years
- 1 DOB complaint from 2022 through November 25, 2026. 11 DOB violations since 1997, 4 dismissed in DOB's records.
- Boiler inspection
- Inspected October 19, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 8 other open violations this page lists without it.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 6,755 Queens buildings with 6 to 19 apartments.
- All 1 DOB summons at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.