Skip to content
ViolationScout15 open Class C, with 0 certifications filed and 7 new Class C in the last 180 days, too few to call a direction.Your building
Buildings190-20 102 Avenue, QueensCurrent through

190-20 102nd Ave

Hollis, Queens, NY 11423

190-20 102nd Avenue is a two-family house, built in 1920. It has 22 open violations, 15 of them Class C, immediately hazardous. The oldest open HPD violation was filed on November 8, 2023.

En español: 15 violaciones de Clase C abiertas (peligro inmediato) y 22 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 8 de noviembre de 2023.

Open now, most hazardous first

  1. 15

    Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.

    16 open counting every year, the oldest since

    Get these certified
  2. 7

    Class B, hazardous, filed in the last 3 years. Most often Vermin / Infestation.

    See the 7

Open violations are sitting, with little movement either way. 0 certifications filed and 7 new Class C in the last 180 days, too few to call a direction.

The original certify-by dates on the 22 open HPD violations run from October 31, 2025 to December 1, 2026.

Zoning district
R2
Lot area
4,000 sq ft
Floor area
2,100 sq ft
Tax lot (BBL)
4-10858-0014

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C15 open most often Lead Paint
Lead PaintNotice sent19095518
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
Lead PaintNotice sent19090281
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from west at north wall, 2nd window frame from west at north wall, 1st window frame from north at east wall in the 1st room from north
Lead PaintNotice sent19090280
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from south at west wall door frame, 1st door frame from south at west wall, 1st window frame from east at south wall, 1st window frame from north at east wall in the 4th room from north at east
Lead PaintNotice sent19090279
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall in the 3rd room from north at east
Lead PaintNotice sent19090278
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from west at north wall in the kitchen
Lead PaintNotice sent19090277
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from west at north wall, 1st door frame from south at west wall in the 1st private hallway from north
Lead PaintNotice sent19090275
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 2nd room from north
Lead PaintNotice sent18940515
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from east at south wall in the 2nd room from north at east
Lead PaintNotice sent18275719
§ 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six
Lead PaintNotice sent18275410
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from north at east wall, 1st window frame from east at south wall in the bathroom
Lead PaintNotice sent18275409
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from south at west wall in the 2nd room from north
Lead PaintNotice sent18275408
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from south at west wall in the foyer
Lead PaintNotice sent18275407
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from west at north wall in the kitchen
Lead PaintNotice sent18275406
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the kitchen
Lead PaintNotice sent18275405
§ 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st closet from south at west wall door frame, 1st door frame from east at south wall, 1st window frame from north at east wall in the 3rd room from north at east
In HPD's words. Apartment numbers are left out.
Class B7 open most often Vermin / Infestation
Vermin / InfestationNotice sent19286244
Vermin / InfestationNotice sent19286243
Vermin / InfestationNotice sent19084433
Vermin / InfestationNotice sent18818519
Notice sent18758973
Vermin / InfestationNotice sent18758972
Vermin / InfestationNotice sent18265481
Is this your building?Also for tenants and buyers
Is this your building?

We read every request ourselves. If we know a firm that handles this kind of work, we'll tell you who, and we only share your details if you say yes.

Your details stay with us. We share them with a firm only if you say yes. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See what's in the report first

Or file it yourself: what it can hold up, and how correction is filed

The building report reads this record for you: the city's wording on each open Class B violation filed in the last 3 years, what each status means, and how the building compares with others its size.

See what's in the report

HPD takes complaints from tenants through 311.

JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix

For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it

HPD and other city records

Open Class C, week by week
16 on September 24, 2026 and 15 on November 15.
HPD, by year
From 2023 to 2026, HPD filed 38 violations and closed 3, all classes.
YearFiledClosed
2026233
2025120
202330

DOB records

DOB complaints
1 DOB complaint in the last 12 months. It was filed October 17, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
DOB, all years
2 DOB complaints from 2003 through November 25, 2026.

The building report

The cover of the sample report, a real Brooklyn building with apartment numbers removed.Page 3 of the sample report, What is open, for the same building.

Get the report, $19 See a sample report

You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

The most common category among the open records here is lead paint.

Nearby buildings

Questions about this building

Does 190-20 102nd Ave have open violations?

Yes. It had 22 open violations on November 25, 2026: 22 from HPD. 15 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 3 years, since November 8, 2023.

Is this building getting better or worse?

Open violations are sitting, with little movement either way. 15 open Class C, with 0 certifications filed and 7 new Class C in the last 180 days, too few to call a direction. The 180 days run to November 25, 2026.

Everything on this page comes from the city records listed below. A violation closed after the date at the top may still show as open here. If something is wrong, ask for a correction.

Sources. HPD housing violations and OATH/ECB hearing results, plus the neighborhood from HPD and DOB records, DOB complaints and the city's PLUTO tax-lot file. Open violation counts cover the last 3 years: HPD Class B and C violations still open, and OATH/ECB summonses still active. The city's own pages can show more.

Cite this page

ViolationScout, 190-20 102nd Ave, Queens: 2 units, 15 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through November 25, 2026. https://violationscout.com/building/190-20-102-avenue-queens

How we count: /method.

Is this your building?