Skip to content
ViolationScout1 open Class C, with 3 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.Your building
Buildings2-01 50 Avenue, QueensCurrent through

2-01 50th Ave, Queens

BBL 4-00017-0028

Built
2000
Floors
32
Residential units
372
Building type
Elevator building
Zoning district
M3-1
Lot area
18,500 sq ft
Floor area
395,509 sq ft

En español: 1 violación de Clase C abierta (peligro inmediato) y 3 abiertas en total. La más antigua del HPD lleva 2 años abierta, desde el 2 de septiembre de 2024.

Open now, most hazardous first

  1. 1

    Class C, immediately hazardous

    Oldest open since

    Get it certified
  2. 1

    Class B, hazardous

    See it
  3. 1

    OATH/ECB summons still active

    See it

Open violations are sitting, with little movement either way. 1 open Class C, with 3 certifications filed and 1 new Class C in the last 180 days, too few to call a direction.

Since October 12, 2023, certifications were filed on 4 Class C violations, all 4 by the original certify-by date. How certification works

The original certify-by dates on the 2 open HPD violations have all passed. The latest was July 15, 2026. The report prints the date beside each one.

Is this your building?

1 open Class C and a facade rated SWARMP. The oldest open HPD violation was filed September 2, 2024.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH/ECB summonses
31 DOB and FDNY summonses here since January 1, 2019, with $17,270 in penalties imposed. 1 of them is still active, the one listed under OATH/ECB. 7 judgments docketed, the latest on May 31, 2026. A docketed judgment shows up in a title search.
  • August 5, 2026, FDNY: Inspection and testing.
  • December 9, 2025, FDNY: Inspection and testing. In violation, $300 penalty imposed.
  • June 4, 2025, FDNY: Sign, postings, notices and instructions. In violation, $2,150 penalty imposed.

The newest 3 of 31 summonses OATH lists here. The report lists all 31, with each outcome, the penalty imposed and any docketing date. What the report adds

DOB complaints
1 DOB complaint in the 12 months to September 25, 2026. It was filed October 20, 2025.
DOB facade
2 buildings on this lot are rated SWARMP in their latest facade reports, the newest filed November 7, 2022 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Need this filed?
DOB permits
1 DOB work permit in effect, for Suspended Scaffold work, issued June 30, 2026.
  • Suspended Scaffold, issued June 30, 2026, in effect until January 1, 2027.
  • Suspended Scaffold, issued June 30, 2026, signed off.
  • Mechanical Systems, issued June 15, 2026, signed off.

The newest 3 of 12 permits DOB NOW lists here. The report lists all 12, with job numbers and each job's estimated cost. What the report adds

Certificate of occupancy
Final, issued November 17, 2023.
Local Law 97
Covered since 2024 (DOB's list, March 1, 2026).
Boiler inspection
2 boilers, both inspected in 2026, the latest on May 18. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 9, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumber
Class C1 open
Notice sent18956646
Class B1 open
Notice sent18956647
OATH/ECB1 open
Elevators, Class 2Found in violation39149383P

The full report on 2-01 50th Ave, Queens

Get the report on 2-01 50th Ave, Queens, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Questions about this building

Does 2-01 50 Avenue, Queens have open violations?

Yes. 2-01 50 Avenue, Queens had 3 open violations on October 10, 2026: 2 from HPD and 1 from OATH/ECB. 1 is Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 2 years, since September 2, 2024.

Is 2-01 50 Avenue, Queens getting better or worse?

Open violations are sitting, with little movement either way. 1 open Class C, with 3 certifications filed and 1 new Class C in the last 180 days, too few to call a direction. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 2-01 50 Avenue, Queens?

Since October 12, 2023, certifications were filed on 4 Class C violations, all 4 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Has DOB received complaints about 2-01 50 Avenue, Queens?

Yes. 1 DOB complaint in the 12 months to September 25, 2026. It was filed October 20, 2025. Anyone can complain to DOB about a building or the work going on in it, and DOB then inspects and decides whether there is a violation. A conversion complaint says an apartment may have been added or changed without approval. It is a complaint, not a finding.

What did the latest facade reports find at 2-01 50 Avenue, Queens?

2 buildings on this lot are rated SWARMP in their latest facade reports, the newest filed November 7, 2022 (inspection cycle 9). SWARMP means safe with a repair and maintenance program. Buildings taller than six stories must have their exterior walls inspected once in every inspection cycle under the city's Facade Inspection Safety Program (every five years under DOB's current rule), and each inspection report is filed with DOB as Safe, SWARMP (safe with a repair and maintenance program) or Unsafe. No Report Filed means DOB has no report for that cycle. The rating is from the latest filing and does not describe the facade today; DOB's page for the building shows anything filed since.

Are any DOB work permits in effect at 2-01 50 Avenue, Queens?

Yes. 1 DOB work permit in effect, for Suspended Scaffold work, issued June 30, 2026. A permit in effect allows the work it names. It does not mean the work has started or finished, or that it fixes any violation on this page.

Does 2-01 50 Avenue, Queens have a certificate of occupancy?

Its latest certificate of occupancy is a final one, issued November 17, 2023. A certificate of occupancy says how a building may be used and occupied. A temporary one lets people move in while work finishes and has to be renewed until DOB issues the final one. DOB's records here start in July 2012, so an older certificate may not show.

When was the boiler at 2-01 50 Avenue, Queens last inspected?

It has 2 boilers, both inspected in 2026, the latest on May 18. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 2-01 50 Avenue, Queens last file its bedbug report?

On December 9, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 2-01 50 Avenue, Queens covered by Local Law 97?

Yes. It is on DOB's Local Law 97 covered buildings list. Covered since 2024 (DOB's list, March 1, 2026). Local Law 97 sets greenhouse gas limits for most New York City buildings over 25,000 square feet, and DOB's covered buildings list says which path each building is on. The list reflects DOB's records, which owners can ask DOB to correct. This page never estimates a penalty or says whether a building complies.

When was 2-01 50 Avenue, Queens built?

The city's record gives 2000 as the year 2-01 50 Avenue, Queens was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as an elevator building with 32 floors.

How many apartments does 2-01 50 Avenue, Queens have?

The Department of City Planning's PLUTO tax-lot file lists 372 residential units at 2-01 50 Avenue, Queens. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH/ECB summonses from DOB and FDNY, DOB complaints, DOB facade filings, DOB NOW work permits, DOB certificates of occupancy, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH/ECB summonses from DOB and FDNY, DOB complaints, DOB facade filings, DOB NOW work permits, DOB certificates of occupancy, DOB boiler inspection reports, HPD's annual bedbug reports, DOB's Local Law 97 covered buildings list and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 2-01 50th Ave, Queens: 372 units, 1 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/2-01-50-avenue-queens

How we count: /method.

Is this your building?