Skip to content
ViolationScout3 open Class C, with 2 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.Your building
Buildings1432 Crotona Park East, BronxCurrent through

1432 Crotona Park East, Bronx

BBL 2-02938-0014

Built
1908
Floors
5
Residential units
21
Building type
Walk-up building
Zoning district
R7-1
Lot area
5,158 sq ft
Floor area
15,660 sq ft

En español: 3 violaciones de Clase C abiertas (peligro inmediato) y 14 abiertas en total. La más antigua del HPD lleva 9 meses abierta, desde el 7 de enero de 2026.

Open now, most hazardous first

  1. 3

    Class C, immediately hazardous. Most often Vermin / Infestation.

    Oldest open since

    Get these certified
  2. 9

    Class B, hazardous. Most often Fire Safety.

    See the 9
  3. 2

    OATH/ECB summonses still active. Most often Construction.

    See the 2

Open violations are sitting, with little movement either way. 3 open Class C, with 2 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.

Since October 12, 2023, certifications were filed on 4 Class C violations, all 4 by the original certify-by date. How certification works

The original certify-by dates on the 12 open HPD violations run from April 4, 2026 to October 29, 2026. The report prints the date beside each one.

Is this your building?

3 open Class C and an OATH hearing on December 18, 2026. The oldest open HPD violation was filed January 7, 2026.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Get leads for your boroughs

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

For a letter to your landlord or a housing court case, the report lists every open violation here, each in the city's own words with the date on its notice. Get the report, $19

OATH hearings
A hearing on a DOB summons is set for December 18, 2026.
OATH/ECB summonses
4 DOB summonses here since January 1, 2019, with $5,625 in penalties imposed. 2 of them are still active, the same 2 listed under OATH/ECB. 1 judgment docketed, on December 31, 2025. A docketed judgment shows up in a title search.
  • June 8, 2026, DOB: Miscellaneous violations. $2,500 penalty imposed.
  • January 10, 2026, DOB: Miscellaneous violations. In violation, $2,500 penalty imposed.
  • September 9, 2025, DOB: Fail to conduct file a final inspection of permitted work with the department. In violation, $625 penalty imposed.

The newest 3 of 4 summonses OATH lists here. The report lists all 4, with each outcome, the penalty imposed and any docketing date. What the report adds

Housing court
2 housing court cases here since 2006, most of them tenant actions.
DOB permits
DOB NOW lists 2 work permits here, the newest issued February 15, 2023, for Sidewalk Shed work.
  • Sidewalk Shed, issued February 15, 2023, expired February 11, 2024.
  • General Construction, issued February 8, 2023, signed off.
Bedbug report
Filed December 15, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C3 open most often Vermin / Infestation
Fire SafetyNo access to reinspect (first try)18707450
Vermin / InfestationNo access to reinspect (first try)18707448
Vermin / InfestationNo access to reinspect (first try)18707447
Class B9 open most often Fire Safety
Fire SafetyNotice sent19206759CROTONA PARK REDEVELOPMENT, LLC
Fire SafetyNotice sent19206758CROTONA PARK REDEVELOPMENT, LLC
No access to reinspect (first try)19122225CROTONA PARK REDEVELOPMENT, LLC
No access to reinspect (first try)18716791
No access to reinspect (first try)18707449
No access to reinspect (first try)18707444
No access to reinspect (first try)18707443
No access to reinspect (first try)18707442
No access to reinspect (first try)18707441
OATH/ECB2 open most often Construction
Construction, Class 1Hearing pending35726590J
Construction, Class 1Found in violation35726264Y

The full report on 1432 Crotona Park East, Bronx

Get the report on 1432 Crotona Park East, Bronx, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Nearby buildings

Questions about this building

Does 1432 Crotona Park East, Bronx have open violations?

Yes. 1432 Crotona Park East, Bronx had 14 open violations on October 10, 2026: 12 from HPD and 2 from OATH/ECB. 3 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 9 months, since January 7, 2026.

Is 1432 Crotona Park East, Bronx getting better or worse?

Open violations are sitting, with little movement either way. 3 open Class C, with 2 certifications filed and 0 new Class C in the last 180 days, too few to call a direction. That window ends October 10, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 1432 Crotona Park East, Bronx?

Since October 12, 2023, certifications were filed on 4 Class C violations, all 4 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 1432 Crotona Park East, Bronx have an OATH hearing coming up?

Yes. A hearing on a DOB summons is set for December 18, 2026. DOB summonses are heard at OATH, the city's hearings office, and OATH can move a hearing to a later date. When nobody shows up, the summons is decided by default, the costliest way one ends.

Has 1432 Crotona Park East, Bronx been in housing court?

Yes. 2 housing court cases here since 2006, most of them tenant actions. HPD takes buildings to housing court to get violations fixed and heat and hot water restored, and it joins tenants' own repair cases, called tenant actions. A case stays open until the court closes it.

When did 1432 Crotona Park East, Bronx last file its bedbug report?

On December 15, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

When was 1432 Crotona Park East, Bronx built?

The city's record gives 1908 as the year 1432 Crotona Park East, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up building with 5 floors.

How many apartments does 1432 Crotona Park East, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 21 residential units at 1432 Crotona Park East, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on OATH hearing dates, OATH/ECB summonses from DOB and FDNY, HPD's housing court cases, DOB NOW work permits, HPD's annual bedbug reports and the city's PLUTO tax-lot file. This page is current through October 10, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus OATH hearing dates, OATH/ECB summonses from DOB and FDNY, HPD's housing court cases, DOB NOW work permits, HPD's annual bedbug reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 1432 Crotona Park East, Bronx: 21 units, 3 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through October 10, 2026. https://violationscout.com/building/1432-crotona-park-east-bronx

How we count: /method.

Is this your building?