3600 Webster Ave, Bronx
- Built
- 2011
- Floors
- 12
- Residential units
- 51
- Building type
- Elevator building
- Zoning district
- R7X
- Lot area
- 7,820 sq ft
- Floor area
- 51,906 sq ft
En español: 5 violaciones de Clase C abiertas (peligro inmediato) y 17 abiertas en total. La más antigua del HPD lleva 13 meses abierta, desde el 13 de agosto de 2025.
Open now, most hazardous first
- 5Get these certified
Class C, immediately hazardous. Most often Heat / Hot Water.
- 12See the 12
Class B, hazardous. Most often Fire Safety.
Open violations are sitting, with little movement either way. 5 open Class C, with 3 certifications filed and 0 new Class C in the last 180 days, too few to call a direction.
Since October 12, 2023, certifications were filed on 11 Class C violations, all 11 by the original certify-by date. How certification works
The original certify-by dates on the 17 open HPD violations have all passed. The latest was May 6, 2026. The report prints the date beside each one.
- OATH/ECB summonses
- 17 DOB and FDNY summonses here since January 1, 2019, with $9,425 in penalties imposed. 7 judgments docketed, the latest on September 15, 2026. A docketed judgment shows up in a title search.
- March 2, 2026, FDNY: Inspection and testing. In violation, $600 penalty imposed.
- March 2, 2026, FDNY: Inspection and testing. In violation, $600 penalty imposed.
- January 10, 2026, FDNY: Inspection and testing. In violation, $1,500 penalty imposed.
The newest 3 of 17 summonses OATH lists here. The report lists all 17, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB facade
- Rated Safe in the latest facade report, filed February 9, 2023 (inspection cycle 9).
- Certificate of occupancy
- Final, issued December 22, 2021.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- 3 boilers, all inspected in 2026, the latest on January 5. Boilers in buildings with 6 or more apartments are inspected every calendar year.
- Bedbug report
- Filed July 6, 2026, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- Tax exemption
- Has a 420-c tax exemption (DOF 2026/27 roll).
- HPD emergency repair order
- 1 completed HPD emergency repair order since October 12, 2023: a general construction order, opened January 10, 2026, awarded for $295.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number |
|---|---|---|---|
| Class C | 5 open most often Heat / Hot Water | ||
| Heat / Hot Water | Notice sent | 18714683 | |
| Heat / Hot Water | Notice sent | 18614483 | |
| Heat / Hot Water | Notice sent | 18614482 | |
| Heat / Hot Water | Notice sent | 18492395 | |
| Vermin / Infestation | Notice sent to tenant | 18389407 | |
| Class B | 12 open most often Fire Safety | ||
| Notice sent | 18714680 | ||
| Fire Safety | Notice sent | 18714679 | |
| Fire Safety | Notice sent | 18714678 | |
| Notice sent | 18530981 | ||
| Notice sent | 18471774 | ||
| Fire Safety | Notice sent | 18159709 | |
| Fire Safety | Notice sent | 18159708 | |
| Notice sent | 18159707 | ||
| Fire Safety | Notice sent | 18159705 | |
| Fire Safety | Notice sent | 18159704 | |
| The report lists all 12, each with the city's own words and the date on its notice. What the report adds | |||
The full report on 3600 Webster Ave, Bronx
- All 17 open violations, each with the city's own words and the date on its notice.
- What each of the 2 city statuses here means, and how many of these carry it.
- How it compares with the 1,979 Bronx buildings with 50 to 99 apartments.
- All 17 DOB and FDNY summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date.
- Every other record on this page, on a cover you can forward.
Get the report on 3600 Webster Ave, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.