283 East 234th St, Bronx
- Built
- 1928
- Floors
- 4
- Residential units
- 21
- Building type
- Walk-up building
- Zoning district
- R5B
- Lot area
- 6,375 sq ft
- Floor area
- 27,000 sq ft
En español: 30 violaciones de Clase C abiertas (peligro inmediato) y 78 abiertas en total. La más antigua del HPD lleva 12 años abierta, desde el 15 de octubre de 2013.
Open now, most hazardous first
- 30Get these certified
Class C, immediately hazardous. Most often Heat / Hot Water.
- 39See the 39
Class B, hazardous. Most often Fire Safety.
- 9See the 9
OATH/ECB summonses still active. Most often Construction.
New violations are coming in faster than certifications are filed. 10 new Class C against 0 certifications filed in the last 180 days.
The original certify-by dates on the 69 open HPD violations run from January 21, 2024 to October 29, 2026. The report prints the date beside each one.
- Open Class C, week by week
- 30 on September 24, 2026 and 30 on October 8.
- OATH hearings
- A hearing on a DOB summons is set for December 4, 2026.
- OATH/ECB summonses
- 11 DOB summonses here since January 1, 2019, with $39,370 in penalties imposed. 9 of them are still active, the same 9 listed under OATH/ECB. 1 judgment docketed, on March 31, 2026. A docketed judgment shows up in a title search.
- September 25, 2026, DOB: Tampered with, removed or defaced a written posted stop work order. $5,000 penalty imposed.
- June 29, 2026, DOB: Tampered with, removed or defaced a written posted stop work order. Decided by default, $5,030 penalty imposed.
- June 24, 2026, DOB: Failure to provide unobstructed exit passageway. Decided by default, $2,530 penalty imposed.
The newest 3 of 11 summonses OATH lists here. The report lists all 11, with each outcome, the penalty imposed and any docketing date. What the report adds
- DOB violations
- 4 active DOB violations, most of them for low-pressure boilers. The newest was issued November 14, 2025.
- Housing court
- 4 housing court cases here since 2014, most of them heat and hot water cases.
- DOB complaints
- 7 DOB complaints in the 12 months to September 25, 2026. The newest was filed September 24, 2026.
- Energy benchmarking
- ENERGY STAR score 68 for 2023, against a median of 66 for Multifamily Housing that year.
- Local Law 97
- Covered under Article 321, the path for certain affordable housing and houses of worship (DOB's list, March 1, 2026).
- Boiler inspection
- Inspected October 10, 2025. Boilers in buildings with 6 or more apartments are inspected every calendar year. Need this filed?
- Bedbug report
- Filed December 31, 2024, for the year to October 31, 2024. Buildings with 3 or more apartments file one with HPD every year.
- Rent stabilization
- Has rent-stabilized apartments (2024 registration).
- HPD emergency repair orders
- 2 completed HPD emergency repair orders since October 12, 2023, awarded for $1,278 in total. The most recent of the 2 was opened August 14, 2026.
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 30 open most often Heat / Hot Water | |||
| Fire Safety | Notice sent | 19185394 | ||
| Notice sent | 19185391 | |||
| Heat / Hot Water | Notice sent | 19107881 | THE MEL HOLDINGS LLc | |
| Fire Safety | Notice sent | 19099790 | THE MEL HOLDINGS LLc | |
| Fire Safety | Notice sent | 19093190 | THE MEL HOLDINGS LLc | |
| Fire Safety | Notice sent | 19075244 | THE MEL HOLDINGS LLc | |
| Fire Safety | Notice sent | 19075243 | THE MEL HOLDINGS LLc | |
| Heat / Hot Water | Notice sent | 19000632 | THE MEL HOLDINGS LLc | |
| Heat / Hot Water | Notice sent | 18805144 | THE MEL HOLDINGS LLc | |
| Heat / Hot Water | Notice sent | 18805143 | THE MEL HOLDINGS LLc | |
| The report lists all 30, each with the city's own words and the date on its notice. What the report adds | ||||
| Class B | 39 open most often Fire Safety | |||
| Fire Safety | Notice sent | 19185398 | ||
| Fire Safety | Notice sent | 19185397 | ||
| Notice sent | 19185395 | |||
| Notice sent | 19185393 | |||
| Notice sent | 19185390 | |||
| Fire Safety | Notice sent | 19107883 | THE MEL HOLDINGS LLc | |
| Fire Safety | Notice sent | 19107882 | THE MEL HOLDINGS LLc | |
| Notice sent | 19107880 | THE MEL HOLDINGS LLc | ||
| Notice sent | 19107879 | THE MEL HOLDINGS LLc | ||
| Fire Safety | Notice sent | 19099799 | THE MEL HOLDINGS LLc | |
| The report lists all 39, each with the city's own words and the date on its notice. What the report adds | ||||
| OATH/ECB | 9 open most often Construction | |||
| Construction, Class 1 | Hearing pending | 39205650Y | ||
| Construction, Class 1 | Decided by default | 39194066Y | THE MEL HOLDINGS LLc | |
| Construction, Class 1 | Decided by default | 39193560P | THE MEL HOLDINGS LLc | |
| Class 1 | Decided by default | 39193559H | THE MEL HOLDINGS LLc | |
| Construction, Class 1 | Decided by default | 39193555K | THE MEL HOLDINGS LLc | |
| Construction, Class 1 | Decided by default | 39193551N | THE MEL HOLDINGS LLc | |
| Class 1 | Decided by default | 39193549Y | THE MEL HOLDINGS LLc | |
| Construction, Class 1 | Decided by default | 39191138K | THE MEL HOLDINGS LLc | |
| Construction, Class 1 | Decided by default | 39161359R | ||
The full report on 283 East 234th St, Bronx
- All 78 open violations, each with the city's own words and the date on its notice.
- What each of the 3 city statuses here means, and how many of these carry it.
- How it compares with the 3,231 Bronx buildings with 20 to 49 apartments.
- All 11 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 9 still active.
- Every other record on this page, on a cover you can forward.
Get the report on 283 East 234th St, Bronx, $19 See a sample report
Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.