Skip to content
ViolationScout14 open Class C, with 0 certifications filed and 5 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings249 Vernon Avenue, BrooklynCurrent through

249 Vernon Ave, Brooklyn

BBL 3-01757-0051

En español: 14 violaciones de Clase C abiertas (peligro inmediato) y 24 abiertas en total.

Open violations are sitting, with little movement either way. 14 open Class C, with 0 certifications filed and 5 new Class C in the last 180 days, too few to call a direction.

Since September 28, 2023, certifications were filed on 4 Class C violations, all 4 by the original certify-by date. How certification works

Is this your building?

14 open Class C.

We read every request ourselves. When a compliance firm we work with can take the building, we introduce you to that one firm. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: which violations matter, and how long this kind usually takes to clear. It is not on sale yet.

See what the report covers

HPD takes complaints from tenants through 311.

DOB violations
1 active DOB violation, issued August 16, 1993.
Rent stabilization
Has rent-stabilized apartments (2024 registration).

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C14 open most often Fire Safety
Fire SafetyNotice sent19245706
Notice sent19169699RH VERNON LLC
Notice sent19169698RH VERNON LLC
Notice sent19169696RH VERNON LLC
Notice sent19169695RH VERNON LLC
Heat / Hot WaterNotice sent18527381RH VERNON LLC
Notice sent18527371RH VERNON LLC
Notice sent18527370RH VERNON LLC
Notice sent18527366RH VERNON LLC
Fire SafetyNotice sent18527362RH VERNON LLC
Notice sent18527360RH VERNON LLC
Notice sent18527359RH VERNON LLC
Heat / Hot WaterNotice sent18527358RH VERNON LLC
Fire SafetyNotice sent17339793
Class B10 open most often Fire Safety
Notice sent19245707
Notice sent19245704
Fire SafetyNotice sent19040085RH VERNON LLC
Fire SafetyNotice sent19040084RH VERNON LLC
Notice sent19040083RH VERNON LLC
Notice sent18694669RH VERNON LLC
Notice sent18694667RH VERNON LLC
Notice sent18694662RH VERNON LLC
Notice sent18694643RH VERNON LLC
MoldNo access to reinspect (first try)18828707RH VERNON LLC

Nearby buildings

Questions about this building

Does 249 Vernon Avenue, Brooklyn have open violations?

Yes. 249 Vernon Avenue, Brooklyn had 24 open violations on September 26, 2026: 24 from HPD. 14 are Class C, the class HPD treats as immediately hazardous.

Is 249 Vernon Avenue, Brooklyn getting better or worse?

Open violations are sitting, with little movement either way. 14 open Class C, with 0 certifications filed and 5 new Class C in the last 180 days, too few to call a direction. That window ends September 26, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 249 Vernon Avenue, Brooklyn?

Since September 28, 2023, certifications were filed on 4 Class C violations, all 4 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Does 249 Vernon Avenue, Brooklyn have active DOB violations?

Yes. 1 active DOB violation, issued August 16, 1993. The Department of Buildings writes these separately from HPD's housing violations, for things like boilers, elevators, facades, construction and energy filings. Each one stays active until DOB resolves or dismisses it.

Is 249 Vernon Avenue, Brooklyn rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 249 Vernon Avenue, Brooklyn built?

The city's record gives 1931 as the year 249 Vernon Avenue, Brooklyn was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up apartment building with 3 floors.

How many apartments does 249 Vernon Avenue, Brooklyn have?

The Department of City Planning's PLUTO tax-lot file lists 6 residential units at 249 Vernon Avenue, Brooklyn. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on DOB violations, the Rent Guidelines Board's stabilized-building lists and the city's PLUTO tax-lot file. This page is current through September 26, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus DOB violations, the Rent Guidelines Board's stabilized-building lists and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 249 Vernon Ave, Brooklyn: 14 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 26, 2026. https://violationscout.com/building/249-vernon-avenue-brooklyn

How we count: /method.

Is this your building?