268 Union Ave
Brooklyn, NY 11211
268 Union Avenue is a walk-up building with 7 apartments, built in 1911. It has 13 open violations, 8 of them Class C, immediately hazardous. The oldest open HPD violation was filed on October 30, 2023.
En español: 8 violaciones de Clase C abiertas (peligro inmediato) y 13 abiertas en total. La más antigua del HPD lleva 3 años abierta, desde el 30 de octubre de 2023.
Open now, most hazardous first
- 8Get these certified
Class C, immediately hazardous, filed in the last 3 years. Most often Lead Paint.
- 2See the 2
Class B, hazardous, filed in the last 3 years
- 3See the 3
OATH/ECB summonses still active. Most often Construction.
11.4 open Class C per 10 apartments. Across the city: 0.7.
Certifications are being filed at least twice as fast as new violations come in. 14 certifications filed against 1 new Class C in the last 180 days.
Since November 27, 2023, certifications were filed on 27 Class C violations, all 27 by the original certify-by date. How certification works
The original certify-by dates on the 10 open HPD violations have all passed. The latest was November 13, 2026.
- Zoning district
- R7A
- Lot area
- 2,500 sq ft
- Floor area
- 5,000 sq ft
- Last sale
- $1,910,914
- Tax lot (BBL)
- 3-03031-0004
Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.
| Filed | Category | Status | Number | Registered party when filed |
|---|---|---|---|---|
| Class C | 8 open most often Lead Paint | |||
| Vermin / Infestation | Notice sent to tenant | 19247589 | 268 UNION LLC | |
| HMC ADM CODE: § 27-2017.4 abate the infestation consisting of roaches in the entire apartment | ||||
| Lead Paint | Defect letter sent | 18799177 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from west at north wall in the 4th room from east | ||||
| Lead Paint | Defect letter sent | 18799176 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) south wall in the 3rd room from east | ||||
| Lead Paint | Defect letter sent | 18799174 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from west at north wall in the 1st kitchen from east at south | ||||
| Lead Paint | Notice sent | 18238037 | ||
| § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six | ||||
| Lead Paint | Defect letter sent | 18237825 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5MG/CM2 and is presumed lead paint as set forth in (28 RCNY §11-07(B)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 RCNY §11-06(B)(2) 1st door from west at north wall in the 4th room from east | ||||
| Lead Paint | Defect letter sent | 18237824 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from west at north wall in the 4th room from east | ||||
| Lead Paint | Defect letter sent | 18237822 | ||
| § 27-2056.6 ADM CODE - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 RCNY §11-06(B)(2) 1st door frame from west at north wall in the kitchen | ||||
| In HPD's words. Apartment numbers are left out. | ||||
| Class B | 2 open | |||
| CIV14 mailed | 19247588 | 268 UNION LLC | ||
| CIV14 mailed | 19247587 | 268 UNION LLC | ||
| OATH/ECB | 3 open most often Construction | |||
| Construction, Class 1 | Hearing pending | 39201919J | ||
| Construction, Class 1 | Hearing pending | 39201907M | ||
| Construction, Class 1 | Hearing pending | 39183055P | ||
Is this your building?Also for tenants and buyers
HPD takes complaints from tenants through 311.
JustFix mails your landlord a free letter asking for repairs, by USPS Certified Mail. Start the letter on JustFix
For a housing court case, the report puts every open violation here on one record you can forward, each with the date on its notice. See what's in it
HPD and other city records
- Open Class C, week by week
- 16 on September 24, 2026 and 8 on November 15.
- HPD, by year
- From 2017 to 2026, HPD filed 334 violations and closed 326, all classes.
Year Filed Closed 2026 73 104 2025 73 38 2024 5 48 2023 126 112 2022 47 10 2018 9 14 2017 1 0 - Bedbug report
- Filed December 23, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year. The report is filed whether or not the building had bedbugs.
- Rent stabilization
- Has at least one rent-stabilized apartment (2024 registration). The list names buildings, not apartments. NYS HCR can say whether a particular apartment is stabilized.
- HPD emergency repair order
- 1 completed HPD emergency repair order since November 27, 2023: a plumbing order, opened February 14, 2026, awarded for $5,200. The amount is what HPD awarded for the work, not a bill. What was charged or paid is not shown here.
Hearings and penalties
- OATH hearings
- 3 hearings scheduled on DOB summonses, the first on February 26, 2027.
- OATH/ECB summonses
- 6 DOB summonses here since January 1, 2019, with $18,125 in penalties imposed. 3 of them are still active, the same 3 listed under OATH/ECB.
- August 26, 2026, DOB: Failure to obey a vacate order from the commissioner. Adjourned, $10,000 penalty imposed.
- August 26, 2026, DOB: Unlawful acts. Failure to comply with an order of the commissioner. Adjourned, $2,500 penalty imposed.
- April 2, 2026, DOB: Failure to maintain per BC1008.1.8; 27-371; BC1008.1.9;BC1010.1.8;BC1010.1.9. Adjourned, $1,250 penalty imposed.
The newest 3 of 6 summonses OATH lists here.
- Housing court
- 1 housing court case here, opened in 2026. These are HPD's cases to get repairs made or to get in to inspect, and tenants' repair cases HPD joined. Evictions are not counted.
DOB records
- DOB violations
- 1 active DOB violation, issued August 16, 1993.
- DOB complaints
- 3 DOB complaints in the last 12 months. The newest was filed August 26, 2026. A complaint is only a report to DOB. DOB inspects and decides whether there is a violation.
- DOB, all years
- 8 DOB complaints from 2023 through November 25, 2026. 16 DOB violations since 1993, 15 dismissed in DOB's records.
- Boiler inspection
- Inspected October 26, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
The building report
- The city's wording on the 5 other open violations this page lists without it.
- What each of the 5 city statuses here means, and how many of these carry it.
- How it compares with the 19,359 Brooklyn buildings with 6 to 19 apartments.
- All 6 DOB summonses at OATH/ECB, with each outcome, the penalty imposed and any docketing date, and the hearing dates on the 3 still active.
- Every other record on this page, on a cover you can forward.


Get the report, $19 See a sample report
You get it on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.