Skip to content
ViolationScout10 open Class C, with 6 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.Is this your building?
Buildings301 East 193 Street, BronxCurrent through

301 East 193rd St, Bronx

BBL 2-03287-0001

En español: 10 violaciones de Clase C abiertas (peligro inmediato) y 16 abiertas en total. La más antigua del HPD lleva 6 años abierta, desde el 11 de octubre de 2019.

Open violations are sitting, with little movement either way. 10 open Class C, with 6 certifications filed and 2 new Class C in the last 180 days, too few to call a direction.

The oldest open HPD violation has been open 6 years, since October 11, 2019.

Since September 29, 2023, certifications were filed on 8 Class C violations, all 8 by the original certify-by date. How certification works

Is this your building?

10 open Class C. The oldest open HPD violation was filed October 11, 2019.

A firm we work with can take these on. We reply within one business day with the firm's name. You decide whether to talk to them. One firm, not a list.

Your details stay with us, and go only to the one firm you are introduced to. No lists, no resale.

¿Es su edificio? Déjenos un correo o un teléfono. Leemos cada solicitud.

See everything first: the building report, $19

Or file it yourself: what it can hold up, and how correction is filed

The case file on a building like this names who is responsible on HPD's registration and how to reach them. We prepare them for firms on our pilot, ranked by how much hazardous work is open.

Request a sample file

The building report reads this record for you: every open violation in the city's own words, what each status means, and how the building compares with others its size. Usually ready within 15 minutes of payment.

Get the report, $19

HPD takes complaints from tenants through 311.

Boiler inspection
Inspected May 10, 2026. Boilers in buildings with 6 or more apartments are inspected every calendar year.
Bedbug report
Filed December 2, 2025, for the year to October 31, 2025. Buildings with 3 or more apartments file one with HPD every year.
Rent stabilization
Has rent-stabilized apartments (2024 registration).
HPD emergency repair orders
2 completed HPD emergency repair orders since September 29, 2023, awarded for $12,505 in total. The most recent of the 2, a lead paint order, was opened August 6, 2026.

Open violations by class. A party is named only where the building's HPD registration covers the date a violation was filed.

FiledCategoryStatusNumberRegistered party when filed
Class C10 open most often Lead Paint
Vermin / InfestationNotice sent to tenant19190309
Vermin / InfestationNotice sent to tenant19181859SCG 301, LLC.
Lead PaintDefect letter sent18623962SCG 301, LLC.
Heat / Hot WaterInvalid certification18606684SCG 301, LLC.
Invalid certification18606683SCG 301, LLC.
Heat / Hot WaterInvalid certification18606682SCG 301, LLC.
Notice sent17497233
Lead PaintDefect letter sent17309258
Lead PaintDefect letter sent17309256
MoldNotice sent to tenant17298960
Class B6 open
Notice sent19190308
Notice sent19190307
Notice sent19181860SCG 301, LLC.
Notice sent17629762
Notice sent17497234
Vermin / InfestationNotice sent17298966

The full report on 301 East 193rd St, Bronx

Get the report on 301 East 193rd St, Bronx, $19 See a sample report

Usually ready within 15 minutes of payment, on your order page and by email. If it tells you nothing you did not already know, reply and we refund it.

Other buildings on this tax block

Nearby buildings

Questions about this building

Does 301 East 193 Street, Bronx have open violations?

Yes. 301 East 193 Street, Bronx had 16 open violations on September 27, 2026: 16 from HPD. 10 are Class C, the class HPD treats as immediately hazardous. The oldest open HPD violation has been open 6 years, since October 11, 2019.

Is 301 East 193 Street, Bronx getting better or worse?

Open violations are sitting, with little movement either way. 10 open Class C, with 6 certifications filed and 2 new Class C in the last 180 days, too few to call a direction. That window ends September 27, 2026. It compares certifications filed with new Class C violations, and it describes what happened, not what anyone intends.

When were certifications filed on Class C violations at 301 East 193 Street, Bronx?

Since September 29, 2023, certifications were filed on 8 Class C violations, all 8 by the original certify-by date. A certification is the filing, dated when it was made, not HPD's acceptance of it. It is compared with the original certify-by date on the notice. A granted postponement moves that date and the city's data keeps only the first, so a certification counted after it may still have met a postponed date.

Are any HPD emergency repair orders at 301 East 193 Street, Bronx marked completed?

Yes. 2 completed HPD emergency repair orders since September 29, 2023, awarded for $12,505 in total. The most recent of the 2, a lead paint order, was opened August 6, 2026. HPD orders an emergency repair when a hazardous condition cited in a violation, or in another agency's emergency order, is not corrected, and does the work itself or through a contractor. The amounts are what the orders were awarded for, not a bill: this page does not show what was charged to the property or whether it was paid. Orders for lab tests, such as dust-wipe and asbestos samples, are not counted.

When was the boiler at 301 East 193 Street, Bronx last inspected?

On May 10, 2026. DOB requires a boiler in a building with 6 or more apartments to be inspected once every calendar year, with the report filed within 14 days of the inspection. Low-pressure boilers in residential buildings with 5 or fewer apartments are exempt.

When did 301 East 193 Street, Bronx last file its bedbug report?

On December 2, 2025, for the year to October 31, 2025. HPD asks the owner of every building with 3 or more apartments for this report once a year, covering November 1 to October 31, including buildings that had no bedbugs.

Is 301 East 193 Street, Bronx rent stabilized?

The building has rent-stabilized apartments on its 2024 registration. That comes from the Rent Guidelines Board's list of buildings with at least one stabilized apartment registered that year. Buildings that registered late are left off, and a 421-a or J-51 building can leave stabilization when its tax benefit ends. A particular apartment's status is for NYS HCR to say.

When was 301 East 193 Street, Bronx built?

The city's record gives 1910 as the year 301 East 193 Street, Bronx was built, in the Department of City Planning's PLUTO tax-lot file. The same file classes it as a walk-up apartment building with 5 floors.

How many apartments does 301 East 193 Street, Bronx have?

The Department of City Planning's PLUTO tax-lot file lists 12 residential units at 301 East 193 Street, Bronx. The count is for the whole tax lot.

Where do these numbers come from?

From New York City's own data: HPD housing violations and OATH/ECB hearing results, read whole rather than sampled. It also draws on the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. This page is current through September 27, 2026. The city's data changes daily, so a violation certified after that can still show as open here; the city's own page for this building is linked above.

Sources. HPD housing violations and OATH/ECB hearing results, plus the Rent Guidelines Board's stabilized-building lists, HPD emergency repair orders, DOB boiler inspection reports, HPD's annual bedbug reports and the city's PLUTO tax-lot file. Counts cover HPD Class B and C violations from the last 3 years that HPD still shows open, and OATH/ECB summonses from the same 3 years that the city still shows active. The city's own pages can show more, never fewer.

Cite this page

ViolationScout, 301 East 193rd St, Bronx: 10 open Class C, from New York City's HPD violation and OATH/ECB hearing data. Figures through September 27, 2026. https://violationscout.com/building/301-east-193-street-bronx

How we count: /method.

Is this your building?